Who runs the grid
Field note 04, 2024, WA, MT
Who owns, runs, balances and sells the power from a Northwest plant?
A power plant has an owner, an operator, a balancing authority and someone who eventually sells the electricity. They are four different relationships and they often belong to four different organizations. Here is how to tell them apart, using seven Northwest plants.
Four roles, one dam
Source & method
Sum of generator nameplate MW with operational status code OP in the inventory year; one row per generator; unscaled by ownership
2024 inventory · reported · derived · valid · final
33 of 33 operating generators included.
out_eia__yearly_generators.parquet; report_date=2024-01-01; plant_id_eia=6163
Publisher & attribution ↗ Cite this released fact ↗Source & method
Generator rows with status code OP
2024 inventory · reported · derived · valid · final
out_eia__yearly_generators.parquet; report_date=2024-01-01; plant_id_eia=6163
Publisher & attribution ↗ Cite this released fact ↗Source & method
Sum of EIA-923 annual net generation over the plant's unique prime-mover x energy-source rows; negative values (pumping, station use) retained
2024 calendar year · reported · derived · valid · final
2 of 2 plant x prime-mover x fuel rows included.
out_eia923__yearly_generation_fuel_combined.parquet; report_date=2024-01-01; plant_id_eia=6163
Publisher & attribution ↗ Cite this released fact ↗Partial or uncertain coverage: Reported operating capacity; missing components stay missing
Source & method
Sum of operating nameplate MW over published plants whose reported balancing authority code is this BA; a reporting relationship, not a footprint
2024 inventory · reported · derived · suspect · final
153 of 154 plants included.
Reported operating capacity; missing components stay missing
core_eia__codes_balancing_authorities.parquet; code=BPAT
Publisher & attribution ↗ Cite this released fact ↗Grand Coulee gives four different answers to "who runs it". The owner and the operator are the same federal agency, Bureau of Reclamation, which holds all 6,809 MW of operating capacity at the dam and runs every generator. That single-operator, many-owners shape comes straight from the survey: only the operator of a plant files the annual generator inventory, and ownership is reported separately, generator by generator [1]. Reclamation's part of the dam is three generating plants and a pump generating plant [9], which together produced 15,443,458 MWh in 2024.
The marketer is a third party. The Federal Columbia River Power System is a collaboration of three federal agencies: the Bonneville Power Administration was created to market the electricity, while dam operations stayed with the Corps of Engineers and Reclamation [5]. BPA markets wholesale power from the federal hydro projects, one non-federal nuclear plant and several small non-federal plants [4]. Federal law requires it to give preference and priority to public bodies and cooperatives [8], and it sells under long-term contracts: the Regional Dialogue contracts run out in 2028 [6], and Provider of Choice contracts take over for deliveries from October 2028 [7].
The balancing authority is a fourth thing again. Grand Coulee reports into Bonneville Power Administration, which holds 27,571.3 MW of operating capacity. A balancing authority keeps supply, demand and interchange in balance inside an electrically defined area [2]; it is an operating and accounting boundary, not a wire to a customer and not a service territory.
Who finally sells this energy to a household is not in the atlas. Owning, operating, marketing and balancing are four separate relationships, and only three of them are published here.
Grand Coulee on the capacity map ↗(opens the atlas in a new tab)
One company in every role
Source & method
Sum over operating generators of nameplate MW x this organization's ownership fraction (reported schedule or EIA-860 schedule-4 default)
2024 inventory · reported · derived · valid · final
17 of 17 plants included.
out_eia__yearly_utilities.parquet; report_date=2024-01-01; utility_id_eia=15500
Publisher & attribution ↗ Cite this released fact ↗Source & method
Sum of operating generator nameplate MW at plants where this organization is the reported operator
2024 inventory · reported · derived · valid · final
19 of 19 plants included.
Reported operating capacity; partial plant/unit coverage is marked
out_eia__yearly_utilities.parquet; report_date=2024-01-01; utility_id_eia=15500
Publisher & attribution ↗ Cite this released fact ↗Source & method
Sum of operating nameplate MW over published plants whose reported balancing authority code is this BA; a reporting relationship, not a footprint
2024 inventory · reported · derived · valid · final
38 of 38 plants included.
Reported operating capacity; missing components stay missing
core_eia__codes_balancing_authorities.parquet; code=PSEI
Publisher & attribution ↗ Cite this released fact ↗Source & method
Sum of operating generator nameplate MW at plants where this organization is the reported operator
2024 inventory · reported · derived · valid · final
2 of 2 plants included.
Reported operating capacity; partial plant/unit coverage is marked
out_eia__yearly_utilities.parquet; report_date=2024-01-01; utility_id_eia=15298
Publisher & attribution ↗ Cite this released fact ↗Source & method
Sum over operating generators of nameplate MW x this organization's ownership fraction (reported schedule or EIA-860 schedule-4 default)
2024 inventory · reported · derived · valid · final
1 of 1 plants included.
out_eia__yearly_utilities.parquet; report_date=2024-01-01; utility_id_eia=15298
Publisher & attribution ↗ Cite this released fact ↗Puget Sound Energy holds every role at once. It owns 3,161.3 MW of operating capacity and operates 2,590.8 MW. It is also its own balancing authority: 2,960.3 MW of operating capacity reports into the Puget Sound Energy area. And it sells electricity to end users — the retail rows on its organization page come from the annual industry survey, which collects sales, revenue and customer counts by state, sector and balancing authority [3].
Owned is larger than operated, and the gap is one plant in Montana. Colstrip Steam Electric Station has six owners; the company that runs it is Talen Montana, an independent power producer that operates 1,647.4 MW and owns only 247.1 MW of it. Puget Sound Energy owns a share of Colstrip and runs none of it.
Being the balancing authority is not the same as owning what sits inside it, either. Puget Sound Energy's own Lower Snake River Wind Energy Project reports into Bonneville Power Administration, not into the utility's own area.
Because it is investor-owned, its rates and service are set by a state regulator. The Washington Utilities and Transportation Commission regulates investor-owned electric companies such as Puget Sound Energy, Avista and PacifiCorp, and does not regulate municipal, public utility district or cooperative utilities [10].
Everything Puget Sound Energy owns or operates ↗(opens the atlas in a new tab)
A city that owns its dams
Source & method
Sum of generator nameplate MW with operational status code OP in the inventory year; one row per generator; unscaled by ownership
2024 inventory · reported · derived · valid · final
6 of 6 operating generators included.
out_eia__yearly_generators.parquet; report_date=2024-01-01; plant_id_eia=6433
Publisher & attribution ↗ Cite this released fact ↗Source & method
Sum of EIA-923 annual net generation over the plant's unique prime-mover x energy-source rows; negative values (pumping, station use) retained
2024 calendar year · reported · derived · valid · final
1 of 1 plant x prime-mover x fuel rows included.
out_eia923__yearly_generation_fuel_combined.parquet; report_date=2024-01-01; plant_id_eia=6433
Publisher & attribution ↗ Cite this released fact ↗Source & method
Sum over operating generators of nameplate MW x this organization's ownership fraction (reported schedule or EIA-860 schedule-4 default)
2024 inventory · reported · derived · valid · final
6 of 6 plants included.
out_eia__yearly_utilities.parquet; report_date=2024-01-01; utility_id_eia=16868
Publisher & attribution ↗ Cite this released fact ↗Source & method
Sum of operating nameplate MW over published plants whose reported balancing authority code is this BA; a reporting relationship, not a footprint
2024 inventory · reported · derived · valid · final
9 of 9 plants included.
Reported operating capacity; missing components stay missing
core_eia__codes_balancing_authorities.parquet; code=SCL
Publisher & attribution ↗ Cite this released fact ↗Seattle City Light — the utility the city runs as Seattle City Light — is municipally owned. Washington law lets cities acquire, operate and maintain electric works and regulate the use, distribution and price of the electricity they sell [13], and City Light says it owns and operates several hydroelectric projects that typically supply more than half of its customers' power [21].
The largest is Boundary Dam, on the Pend Oreille River: 1,159.7 MW of operating capacity and 3,020,283 MWh in 2024. It runs under a federal licence. FERC licenses private, municipal and state hydroelectric projects [15] and issued Boundary a forty-two year licence in 2013 [22].
The city is also its own balancing authority. Seattle City Light holds 2,053.8 MW, close to the utility's owned total of 2,046.2 MW — an unusually tidy case in which owner, operator, balancing authority and retail seller are all one organization.
What differs from Puget Sound Energy is who sets the price. No state commission does: the Seattle City Council adopts City Light's rates by ordinance [14], and the state commission names Seattle City Light among the utilities it does not regulate [10].
Plants reporting to the Seattle City Light balancing authority ↗(opens the atlas in a new tab)
Two dams, two balancing authorities
Source & method
Sum of generator nameplate MW with operational status code OP in the inventory year; one row per generator; unscaled by ownership
2024 inventory · reported · derived · valid · final
10 of 10 operating generators included.
out_eia__yearly_generators.parquet; report_date=2024-01-01; plant_id_eia=3887
Publisher & attribution ↗ Cite this released fact ↗Source & method
Sum of generator nameplate MW with operational status code OP in the inventory year; one row per generator; unscaled by ownership
2024 inventory · reported · derived · valid · final
10 of 10 operating generators included.
out_eia__yearly_generators.parquet; report_date=2024-01-01; plant_id_eia=3888
Publisher & attribution ↗ Cite this released fact ↗Source & method
Sum over operating generators of nameplate MW x this organization's ownership fraction (reported schedule or EIA-860 schedule-4 default)
2024 inventory · reported · derived · valid · final
2 of 2 plants included.
out_eia__yearly_utilities.parquet; report_date=2024-01-01; utility_id_eia=14624
Publisher & attribution ↗ Cite this released fact ↗Source & method
Sum of operating generator nameplate MW at plants where this organization is the reported operator
2024 inventory · reported · derived · valid · final
5 of 5 plants included.
Reported operating capacity; partial plant/unit coverage is marked
out_eia__yearly_utilities.parquet; report_date=2024-01-01; utility_id_eia=14624
Publisher & attribution ↗ Cite this released fact ↗Source & method
Sum of operating nameplate MW over published plants whose reported balancing authority code is this BA; a reporting relationship, not a footprint
2024 inventory · reported · derived · valid · final
5 of 5 plants included.
Reported operating capacity; missing components stay missing
core_eia__codes_balancing_authorities.parquet; code=GCPD
Publisher & attribution ↗ Cite this released fact ↗A public utility district is run by its own elected commission — three commissioners, or five in five-commissioner districts, elected by district for six-year terms [12] — and the district has full and exclusive authority over its own rates, free from the state commission [11].
Grant PUD owns 2,170 MW and operates 2,186 MW: more than it owns, because it runs small plants for others. Its two large dams are Priest Rapids Dam at 950 MW and Wanapum Dam at 1,220 MW, licensed together by FERC as the Priest Rapids Project [23].
Same owner, same operator, same river, one licence — and two different balancing authorities. Wanapum reports into the district's own balancing authority, Grant PUD, which holds 1,236 MW; Priest Rapids reports into Bonneville Power Administration. Balancing membership is reported plant by plant and does not follow ownership.
The output does not all stay in the county either. A 1998 federal order requires the district to sell a portion of the project's power, which it does through a public auction [24]. The district's own customers are not the only buyers, and the atlas does not say who the others are.
Every plant Grant County PUD owns or operates ↗(opens the atlas in a new tab)
An agency that owns a reactor and sells nothing
Source & method
Sum of generator nameplate MW with operational status code OP in the inventory year; one row per generator; unscaled by ownership
2024 inventory · reported · derived · valid · final
1 of 1 operating generators included.
out_eia__yearly_generators.parquet; report_date=2024-01-01; plant_id_eia=371
Publisher & attribution ↗ Cite this released fact ↗Source & method
Sum of EIA-923 annual net generation over the plant's unique prime-mover x energy-source rows; negative values (pumping, station use) retained
2024 calendar year · reported · derived · valid · final
1 of 1 plant x prime-mover x fuel rows included.
out_eia923__yearly_generation_fuel_combined.parquet; report_date=2024-01-01; plant_id_eia=371
Publisher & attribution ↗ Cite this released fact ↗Source & method
Net generation MWh / (operating nameplate MW x hours in year); only when every operating generator was operating before the year began and none retired during it
2024 calendar year · reported · derived · valid · final
derived: net_generation_mwh@2024 / (nameplate_mw_op x 8784 h)
Publisher & attribution ↗ Cite this released fact ↗Source & method
Sum over operating generators of nameplate MW x this organization's ownership fraction (reported schedule or EIA-860 schedule-4 default)
2024 inventory · reported · derived · valid · final
4 of 4 plants included.
out_eia__yearly_utilities.parquet; report_date=2024-01-01; utility_id_eia=20160
Publisher & attribution ↗ Cite this released fact ↗Explore Columbia Generating Station ↗
Energy Northwest is a joint operating agency, created by the Washington Legislature in 1957 and overseen by boards drawn from its member public utilities [18]. It is an owner and an operator and it is not a retail seller: it owns 1,324.4 MW of operating capacity and sells nothing to households.
Its largest asset is Columbia Generating Station, the region's only commercial reactor: 1,200 MW of capacity, 9,967,139 MWh generated in 2024, a capacity factor of 0.946 fraction. The chart shows the reported annual totals since 2015; what explains any particular year is not asserted from them. All of that electricity goes to the Bonneville Power Administration at cost, under a net billing agreement [19] — which is why BPA describes what it markets as the federal dams plus one non-federal nuclear plant [4].
Three different bodies decide different things here. The Nuclear Regulatory Commission holds the reactor licence [20]. FERC regulates wholesale sales and interstate transmission but does not regulate nuclear plants, retail sales or federal power marketing agencies [15]. And for balancing, the plant reports into Bonneville Power Administration.
Annual net generation · MWh. Bars below zero are negative net generation; a hollow mark means not reported. Missing years are not filled.
Annual values as a table · MWh
| Calendar year | Net generation · MWh | Evidence |
|---|---|---|
| 2015 | 8,160,912MWh | reported · final |
| 2016 | 9,625,622MWh | reported · final |
| 2017 | 8,128,259MWh | reported · final |
| 2018 | 9,708,441MWh | reported · final |
| 2019 | 8,866,499MWh | reported · final |
| 2020 | 9,427,050MWh | reported · final |
| 2021 | 8,511,288MWh | reported · final |
| 2022 | 9,851,535MWh | reported · final |
| 2023 | 8,435,018MWh | reported · final |
| 2024 | 9,967,139MWh | reported · final |
Columbia Generating Station on the generation map ↗(opens the atlas in a new tab)
A wind farm that sells its whole output
Source & method
Sum of generator nameplate MW with operational status code OP in the inventory year; one row per generator; unscaled by ownership
2024 inventory · reported · derived · valid · final
1 of 1 operating generators included.
out_eia__yearly_generators.parquet; report_date=2024-01-01; plant_id_eia=62936
Publisher & attribution ↗ Cite this released fact ↗Source & method
Sum of EIA-923 annual net generation over the plant's unique prime-mover x energy-source rows; negative values (pumping, station use) retained
2024 calendar year · reported · derived · valid · final
1 of 1 plant x prime-mover x fuel rows included.
out_eia923__yearly_generation_fuel_combined.parquet; report_date=2024-01-01; plant_id_eia=62936
Publisher & attribution ↗ Cite this released fact ↗Source & method
Net generation MWh / (operating nameplate MW x hours in year); only when every operating generator was operating before the year began and none retired during it
2024 calendar year · reported · derived · valid · final
derived: net_generation_mwh@2024 / (nameplate_mw_op x 8784 h)
Publisher & attribution ↗ Cite this released fact ↗Source & method
Sum of operating nameplate MW over published plants whose reported balancing authority code is this BA; a reporting relationship, not a footprint
2024 inventory · reported · derived · valid · final
33 of 33 plants included.
Reported operating capacity; missing components stay missing
core_eia__codes_balancing_authorities.parquet; code=AVA
Publisher & attribution ↗ Cite this released fact ↗Rattlesnake Flat, in Adams County, is owned and operated by Rattlesnake Flat Wind Farm, an independent power producer whose entire portfolio is this one plant: 144 MW of operating capacity, 415,933 MWh generated in 2024, a capacity factor of 0.329 fraction.
It reports into the Avista balancing authority, which holds 2,274.1 MW in all — and Avista, the utility that runs that area, owns none of the wind farm. Avista selected the project through a competitive solicitation and buys its output under a twenty-year power purchase agreement, expecting to recover the cost through its retail rates [25].
So the roles split across two companies. An independent producer owns and runs the turbines; a regulated utility balances the area, buys the energy and sells it to customers; and the state commission reviews what those customers pay [10]. The contract itself is not in this release. Only the plant, its owner, its operator and its balancing authority are.
Rattlesnake Flat on the generation map ↗(opens the atlas in a new tab)
A cooperative that only sells
Source & method
Sum over operating generators of nameplate MW x this organization's ownership fraction (reported schedule or EIA-860 schedule-4 default)
2024 inventory · reported · derived · not_applicable · final
0 of 0 plants included.
out_eia__yearly_utilities.parquet; report_date=2010-01-01; utility_id_eia=14170
Publisher & attribution ↗ Cite this released fact ↗Source & method
Sum of operating generator nameplate MW at plants where this organization is the reported operator
2024 inventory · reported · derived · missing · final
0 of 0 plants included.
Reported operating capacity; partial plant/unit coverage is marked
out_eia__yearly_utilities.parquet; report_date=2010-01-01; utility_id_eia=14170
Publisher & attribution ↗ Cite this released fact ↗Explore Orcas Power & Light Coop ↗
Orcas Power & Light Coop serves the San Juan Islands. It is a member-owned non-profit whose member-owners elect a seven-member board that sets policy and rates, and it buys its power from the Bonneville Power Administration as a full-requirements utility [26].
It owns no generation and operates none, and the atlas says so rather than filling the gap with a zero. Owned capacity reads Not applicable and operated capacity reads Not reported. Its retail sales are published on its organization page, from the annual industry survey [3].
Many organizations in this release look like that: a retail seller with no plants, buying from a marketer under a long-term contract. The preference for public bodies and cooperatives written into federal law [8] is a large part of why so many Northwest retail sellers buy from BPA rather than build.
Wind plants reporting to Avista's balancing authority ↗(opens the atlas in a new tab)
Reading the roles on the map
Every plant page names its operator, lists its owners with the megawatts each holds, and states the balancing authority it reports to. Every organization page carries its roles — owner, operator, retail seller — with owned and operated capacity, and, where it sells, retail sales by state and customer class. Every balancing authority page lists the plants that report to it.
In the atlas, search finds organizations and balancing authorities as well as plants, and selecting one filters the map. Filtering by an organization shows what that organization owns or operates. Filtering by a balancing authority shows what reports to it. The two sets rarely match, and that mismatch is the subject of this note.
Three habits make the rest readable. Read "operator" as who runs it, never as who owns it. Read a balancing authority as an accounting area, never as a service territory or a wire. And read a role that does not apply as missing rather than as zero.
Regulators are not on the map, but they are what makes two identical dams behave differently. Siting in Washington can run through the state council, which recommends and leaves the decision to the governor [16]. Regional planning sits with the Northwest Power and Conservation Council, which writes the power plan and whose fish and wildlife program guides BPA's project funding [17]. Neither of them owns, runs, balances or sells anything.
Washington plants and service areas ↗(opens the atlas in a new tab)
What this note does not claim
No contract appears here. The release carries owners, operators, balancing authorities and retail sales. It does not carry the power sales agreements, net billing arrangements or preference contracts that decide where the energy goes, and it does not describe what any utility's retail supply is made of. Money is absent too: no rates, no tariffs, no rate-case outcomes.
Nothing traces a household to a plant. A balancing authority is not a wire. A service territory is approximate geography, not a supply relationship. Ownership is not delivery. Where a role does not apply, the number stays missing rather than becoming zero.
The decision bodies named here are described from their own published statements of what they decide. The atlas does not yet model dockets, filings or determinations, and nothing on this page says what any of them will decide next.
Views in this note
- Grand Coulee on the capacity map ↗
- Everything Puget Sound Energy owns or operates ↗
- Plants reporting to the Seattle City Light balancing authority ↗
- Every plant Grant County PUD owns or operates ↗
- Columbia Generating Station on the generation map ↗
- Rattlesnake Flat on the generation map ↗
- Wind plants reporting to Avista's balancing authority ↗
- Washington plants and service areas ↗
Context sources
[1] U.S. Energy Information Administration — Form EIA-860 instructions, Annual Electric Generator Report
Only the operator of a jointly owned plant files the form; ownership is reported separately per generator with codes S, J and W, and a plant's balancing authority need not be the owner of its transmission or distribution facilities
[2] U.S. Energy Information Administration — Glossary, balancing authority
A balancing authority integrates resource plans ahead of time, maintains load-interchange-generation balance within its area and supports interconnection frequency in real time
[3] U.S. Energy Information Administration — Form EIA-861, Annual Electric Power Industry Report
EIA-861 collects revenue, sales in megawatthours and customer counts for electricity delivered to end-use customers by state, sector and balancing authority
[4] Bonneville Power Administration — BPA power services
BPA markets wholesale electrical power from 31 federal hydroelectric projects in the Northwest, one nonfederal nuclear plant and several small nonfederal power plants
[5] Bonneville Power Administration, U.S. Army Corps of Engineers and Bureau of Reclamation — The Federal Columbia River Power System (brochure)
The FCRPS is a collaboration of three federal agencies; BPA was created to market the electricity while dam operations remained with the Corps of Engineers and Reclamation, with preference given to publicly and cooperatively owned utilities
[6] Bonneville Power Administration — Regional Dialogue contracts
The 20-year Regional Dialogue power sales contracts use a tiered rate methodology and expire in September 2028
[7] Bonneville Power Administration — Provider of Choice
Provider of Choice contracts succeed Regional Dialogue and cover power deliveries between October 2028 and September 2044
[8] Office of the Law Revision Counsel, U.S. House of Representatives — 16 U.S.C. 832c, preference in the sale of Bonneville project power
In disposing of electric energy the administrator must give preference and priority to public bodies and cooperatives
[9] U.S. Bureau of Reclamation — About Grand Coulee Dam
Grand Coulee Dam includes three major hydroelectric generating plants and a pump generating plant, and is operated as part of a coordinated federal system
[10] Washington Utilities and Transportation Commission — When to call the commission
The UTC regulates investor-owned electric companies such as Puget Sound Energy, Avista and PacifiCorp, and does not regulate municipally owned, public utility district or cooperative electric utilities such as Seattle City Light
[11] Washington State Legislature — RCW 54.16.040, public utility district powers over sales and rates
A public utility district has full and exclusive authority over the use, distribution, rates, service, charges and price of the electricity it sells, free from the jurisdiction and control of the utilities and transportation commission
[12] Washington State Legislature — RCW 54.12.010, public utility district commissioners
A public utility district is governed by three commissioners, or five in five-commissioner districts, elected from commissioner districts for six-year terms
[13] Washington State Legislature — RCW 35.92.050, authority of cities and towns over electric utilities
Cities and towns may acquire, maintain and operate works and plants for furnishing electricity and may regulate and control its use, distribution and price
[14] Seattle City Light — City Council approves City Light rate increases
Seattle City Light's retail rates are adopted by the Seattle City Council in a rate ordinance
[15] Federal Energy Regulatory Commission — What FERC does
FERC regulates the transmission and wholesale sale of electricity in interstate commerce and licenses private, municipal and state hydroelectric projects, and does not regulate retail electricity sales, the construction of generation, nuclear power plants, federal power marketing agencies or most rural electric cooperatives
[16] Washington State Legislature — RCW 80.50.100, council recommendation and the governor's decision
The Energy Facility Site Evaluation Council recommends approval or rejection of a site certification to the governor, who approves, rejects or remands it, and the certification agreement binds on the governor's execution
[17] Northwest Power and Conservation Council — About the Council
The Council develops a regional power plan updated every five years and a fish and wildlife program that guides project funding by the Bonneville Power Administration
[18] Energy Northwest — Who we are
Energy Northwest is a joint operating agency formed by the Washington State Legislature in 1957 and overseen by an executive board, a board of directors and a participants review board
[19] Energy Northwest — Columbia Generating Station
All of Columbia Generating Station's electricity is provided at cost to the Bonneville Power Administration under a formal net billing agreement
[20] U.S. Nuclear Regulatory Commission — Columbia Generating Station facility record
The NRC holds the operating licence for Columbia Generating Station, with Energy Northwest as licensee and a renewed licence running to 2043
[21] Seattle City Light — City Light owned hydroelectric resources
City Light owns and operates several hydroelectric facilities that typically supply more than half of its customers' power needs
[22] Seattle City Light — Seattle City Light receives a 42-year licence for Boundary Dam
FERC issued Seattle City Light a 42-year licence for the Boundary hydroelectric project in 2013
[23] Grant County Public Utility District No. 2 — Generation
Priest Rapids and Wanapum dams, collectively the Priest Rapids Project, are licensed by the Federal Energy Regulatory Commission and are locally owned and operated
[24] Grant County Public Utility District No. 2 — Wholesale power auction
A 1998 FERC order modifying an initial decision requires Grant PUD to sell a portion of its firm and non-firm Priest Rapids Project power, which the district does through a public auction
[25] Avista Corporation — Avista selects Clearway Energy Group's Rattlesnake Flat Wind project for a power purchase agreement
Avista buys the output of the Rattlesnake Flat wind project, developed by Clearway Energy Group, under a 20-year power purchase agreement with deliveries beginning in 2020, and expects to recover the cost through its retail rates
[26] Orcas Power & Light Cooperative — About your co-op
OPALCO is a member-owned non-profit cooperative serving San Juan County whose member-owners elect a seven-member board that sets policy and rates, and it is contracted with the Bonneville Power Administration as a full-requirements utility