Microsoft Redmond campus (PSE special contract)

Microsoft Corporation · Redmond, WA · corporate campus

Initial Term 2018-07-01 to 2038-06-30 with automatic five-year renewals (Special Contract section 3.1); one-time Transition Fee of $23,685,000 paid to PSE for pass-through to customers (Settlement paragraph 10). The 2016 advice filing proposed a Schedule 451 for customers averaging 10 aMW or more under Schedule 40 with 100 MW of Supplied Power in aggregate; the case settled as a special contract instead. Next annual RPS report due by 2027-03-31.

Site
Redmond Main Campus and the other Microsoft Locations listed in Exhibit A of the special contract (Redwest, Overlake and others, by building)Exhibit A (Locations) of the special contract in the settlement approved by Order 06 lists each Microsoft Location by building and voltage (Redmond Main Campus buildings, Building 55 Redwest A to J, Building 124 Overlake and others).
Served by
Puget Sound Energy Inc Named by a filing, not by proximity: docket UE-161123.
Tariff or contract
Schedule 449Sheet ↗
Dockets

Why this facility: The one Washington investor-owned-utility large-load special contract with a public docket and a tariff link (Schedule 449); Microsoft's annual load is filed every year under Order 06 and withheld, which is the gap W66 must show rather than fill. A corporate campus, not a data center: every kind here is an explicit absence.

Announced

What was announced, in the announcer's own unit: floor or cleanroom area, dollars or a power figure. A press or agency release counts only here.
  • No public announcement of the campus's electrical size found; the docket describes the load only as qualifying for retail wheeling Puget Sound Energy · docket UE-161123 · Advice 2016-28 tariff sheets (proposed Schedule 451 Large Customer Retail Wheeling) · Original Sheet No. 451, section 1.1 no source
    No public figure2016-10-07Source ↗

Requested from the utility

What the customer asked the utility to serve, from the utility's filing or the regulator's record; a threshold or floor where the schedule is confidential.
  • Schedule 451 is optional for Customers who have maintained a minimum of an average of 10 aMW at one or more Customer sites served under Schedule 40; the total to be delivered to all Schedule 451 Customers may not exceed 100 megawatts at any one time Puget Sound Energy · docket UE-161123 · Advice 2016-28 tariff sheets (proposed Schedule 451) · Original Sheet No. 451, sections 1.1-1.2 withheld: held by PSE and Microsoft Corporation under Order 03 (Protective Order with Highly Confidential provisions, 2016-11-17) in Docket UE-161123; the sheets state an eligibility threshold and an aggregate cap, not Microsoft's load
    No public figure2016-10-07Source ↗

Minimum billed whether used or not

The minimum the applicable tariff sheet or executed contract bills whether used or not.
  • The special contract prices distribution service by Exhibit C and the Customer Charge by Schedule 449; no minimum billing demand is stated in the public contract Puget Sound Energy · docket UE-161123 · Settlement Stipulation and Agreement, Exhibit A Special Contract · Special Contract section 11 Monthly Rate table no source
    No public figure2017-07-13Source ↗

Contracted

What an executed agreement makes available or interconnection facilities are built to carry.
  • Microsoft's projected aggregate Contract Demand is: To be determined. Puget Sound Energy · docket UE-161123 · Settlement Stipulation and Agreement (2017-04-11), Exhibit A Special Contract, approved by Order 06 · Special Contract section 3.1 (Initial Term 2018-07-01 to 2038-06-30); Exhibit A Locations; Exhibit A paragraph 3 not published: held by PSE and Microsoft Corporation: Contract Demand was to be determined at execution and later amendments to Exhibit A are not in the public docket
    No public figure2017-07-13Source ↗

Forecast attributed to this facility

A utility's or regulator's forecast attributable to this facility alone, with its vintage and geography.
  • No published forecast attributable to the campus found Puget Sound Energy · docket UE-161123 · Docket UE-161123 document sets · documents list, 2016-10-07 to 2026-07-29 no source
    No public figure2026-09-21Source ↗

Measured use

What the meter recorded over a stated period, if any public document states it.
  • Microsoft's annual load under the Special Contract for the prior two years is filed each year in the Microsoft Annual Renewable Portfolio Standard Report and designated confidential as customer-specific usage information Puget Sound Energy · docket UE-161123 · Compliance filing cover letter, Microsoft Annual Renewable Portfolio Standard Report for the 2026 Target Year · cover letter page 1 (customer-specific usage information); Settlement paragraph 13(vi): the annual report includes Microsoft's annual load under the Special Contract for the prior two years withheld: held by Microsoft Corporation and PSE; on file with the UTC as Confidential per the Protective Order in Docket UE-161123 (redacted public version filed 2026-07-24)
    No public figure2026-07-24Source ↗

What is not public

  • AnnouncedNo public announcement of the campus's electrical size found; the docket describes the load only as qualifying for retail wheeling
    no source2016-10-07· Source ↗
  • Requested from the utilitySchedule 451 is optional for Customers who have maintained a minimum of an average of 10 aMW at one or more Customer sites served under Schedule 40; the total to be delivered to all Schedule 451 Customers may not exceed 100 megawatts at any one timeHeld by PSE and Microsoft Corporation under Order 03 (Protective Order with Highly Confidential provisions, 2016-11-17) in Docket UE-161123; the sheets state an eligibility threshold and an aggregate cap, not Microsoft's load.
    withheld2016-10-07· Source ↗
  • ContractedMicrosoft's projected aggregate Contract Demand is: To be determined.Held by PSE and Microsoft Corporation: Contract Demand was to be determined at execution and later amendments to Exhibit A are not in the public docket.
    not published2017-07-13· Source ↗
  • Minimum billed whether used or notThe special contract prices distribution service by Exhibit C and the Customer Charge by Schedule 449; no minimum billing demand is stated in the public contract
    no source2017-07-13· Source ↗
  • Measured useMicrosoft's annual load under the Special Contract for the prior two years is filed each year in the Microsoft Annual Renewable Portfolio Standard Report and designated confidential as customer-specific usage informationHeld by Microsoft Corporation and PSE; on file with the UTC as Confidential per the Protective Order in Docket UE-161123 (redacted public version filed 2026-07-24).
    withheld2026-07-24· Source ↗
  • Forecast attributed to this facilityNo published forecast attributable to the campus found
    no source2026-09-21· Source ↗

Why nothing here is added up

Never add these figures to each other, to a utility forecast that already includes the facility, or across facilities. The utility on a dossier is the one a filing or contract names. Proximity to a substation, a service-territory polygon or a balancing authority never establishes who serves a facility.

  • A superseded announcement restates the earlier one: the chain is one figure, not several.
  • A service request, a minimum billing demand, a contracted capacity and a metered use describe one facility in different roles; the same MW can appear in more than one.
  • A utility's class forecast (Idaho Power's additional firm load, PGE's data-center load) already contains its named customers: adding a named figure counts it twice.
  • MW, MWa, MWh and square feet are different quantities; dollars are not load.