Hydro plantWA

Upriver Dam Hydro Plant

About this record

Spokane County, WA. Reports to the Avista balancing authorityThe organization that balances electricity supply and demand in a reporting area.Definition ↗.

2024 inventory / 2024 calendar year

Nameplate capacity, operating generatorsFull nameplate rating of the operating generators, before ownership shares. MW measures rated power; annual output is energy in MWh.Definition ↗
17.6MW
Source & method

Sum of generator nameplate MW with operational status code OP in the inventory year; one row per generator; unscaled by ownership

2024 inventory · reported · derived · valid · final

5 of 5 operating generators included.

out_eia__yearly_generators.parquet; report_date=2024-01-01; plant_id_eia=50380

Publisher & attribution ↗ Cite this released fact ↗
Net generationEnergy produced over the stated period after the plant’s own use, including signed storage output. Plant output is not allocated to owners or buyers.Definition ↗
48,380MWh
2024
Source & method

Sum of EIA-923 annual net generation over the plant's unique prime-mover x energy-source rows; negative values (pumping, station use) retained

2024 calendar year · reported · derived · valid · final

1 of 1 plant x prime-mover x fuel rows included.

out_eia923__yearly_generation_fuel_combined.parquet; report_date=2024-01-01; plant_id_eia=50380

Publisher & attribution ↗ Cite this released fact ↗
Capacity factor
0.313fraction
2024
Source & method

Net generation MWh / (operating nameplate MW x hours in year); only when every operating generator was operating before the year began and none retired during it

2024 calendar year · reported · derived · valid · final

derived: net_generation_mwh@2024 / (nameplate_mw_op x 8784 h)

Publisher & attribution ↗ Cite this released fact ↗

Output over time

Net generation · MWhElectricity produced after the plant’s own use. A negative value means it used more electricity than it produced.Definition ↗

Annual net generation · MWh. Bars below zero are negative net generation; a hollow mark means not reported. Missing years are not filled.

Annual values as a table · MWh
Reported annual net generation. Missing years are not filled.
Calendar yearNet generation · MWhEvidence
201545,252MWhreported · final
201657,351MWhreported · final
201750,679MWhreported · final
201851,559MWhreported · final
201937,552MWhreported · final
202051,259MWhreported · final
202150,795MWhreported · final
202249,112MWhreported · final
202336,770MWhreported · final
202448,380MWhreported · final

Sum of unique plant x prime-mover x fuel rows per year; negative values retained; missing years absent, not zero; no monthly curve inferred

Why capacity and output differ: field note ↗

Ownership & operation

Ownership basisHow a generator's owners were established: from EIA-860's ownership schedule (reported), from EIA's rule that a unit absent from a complete schedule is wholly owned by its operator (derived), or unknown.Definition ↗
  • OperatorThe organization that runs a plant. It may have different owners.Definition ↗City of Spokane
  • OwnerAn organization with a reported share of a generator. Owned MW applies that share to operating nameplate capacity; it does not establish who buys the output.Definition ↗ Municipally-owned utilityCity of Spokane
    17.6MW owned

Operating nameplate MW x ownership fraction, once per generator; reported schedule or EIA-860 schedule-4 default. Ownership source & rules ↗

Generators at this plant

Unscaled nameplateA generator’s rated maximum power, in MW. Capacity is a rating, not how much electricity it produced.Definition ↗
5 generators, including non-operating units where reported. Status is the inventory-year status.
GeneratorTechnology / statusWhether a generator or project is operating, planned, on standby or retired, as its source reports it.Definition ↗NameplateA generator’s rated maximum power, in MW. Capacity is a rating, not how much electricity it produced.Definition ↗ · MWOwnership basisHow a generator's owners were established: from EIA-860's ownership schedule (reported), from EIA's rule that a unit absent from a complete schedule is wholly owned by its operator (derived), or unknown.Definition ↗
GEN1 Conventional Hydroelectricoperating (OP)2MW
EIA schedule default · derived

Generator absent from a complete Schedule 4 with ownership code S and known operator: wholly owned by the operator per EIA instructions (derived)

City of Spokane · 1 fraction · 2MW owned · reported, derived

GEN2 Conventional Hydroelectricoperating (OP)2MW
EIA schedule default · derived

Generator absent from a complete Schedule 4 with ownership code S and known operator: wholly owned by the operator per EIA instructions (derived)

City of Spokane · 1 fraction · 2MW owned · reported, derived

GEN3 Conventional Hydroelectricoperating (OP)2MW
EIA schedule default · derived

Generator absent from a complete Schedule 4 with ownership code S and known operator: wholly owned by the operator per EIA instructions (derived)

City of Spokane · 1 fraction · 2MW owned · reported, derived

GEN4 Conventional Hydroelectricoperating (OP)5.8MW
EIA schedule default · derived

Generator absent from a complete Schedule 4 with ownership code S and known operator: wholly owned by the operator per EIA instructions (derived)

City of Spokane · 1 fraction · 5.8MW owned · reported, derived

GEN5 Conventional Hydroelectricoperating (OP)5.8MW
EIA schedule default · derived

Generator absent from a complete Schedule 4 with ownership code S and known operator: wholly owned by the operator per EIA instructions (derived)

City of Spokane · 1 fraction · 5.8MW owned · reported, derived

Dam and river

Reviewed identity · 2026-09-21
  • Upriver DamNational Inventory of Dams WA00074· Hydropower is a reported purpose in the NID. Associated power plant is included in the EHA.
    usace-nid
  • Upriver Dam Hydro PlantSpokane River
    EHA hc1777_p01ornl-eha-2026
  • HUC-12 watershed
    170103050402ornl-hilarri-v4
  • NHDPlus reach
    947010231ornl-hilarri-v4

EHA 2026 EIA_PtID 50380 = EIA plant; state WA; EHA point 1.11 km from EIA point; names share a token; HILARRI v4 links EHA id to NID WA00074 (Upriver Dam, Spokane River), NID point 0.52 km from EIA point; NID purposes: Hydroelectric;Recreation. These rows identify the same structures across inventories; they carry no generation, storage or flow figures.Link evidence ↗

CO2 filed by EPA-monitored units

2024

This plant has no coal, gas, oil or waste generator, so it has no combustion unit for EPA to monitor and no CEMS data exists. That is not a claim of zero emissions: the atlas reports only what EPA-monitored units filed. Source

Latest inventoryThe newest complete monthly inventory, with dated status and capacity changes beside the annual baseline totals.Definition ↗ · August 2026

Operating

No confirmed status or capacity changes among comparable units. Missing monthly assertions and units outside the baseline have no like-for-like comparison.

Operating nameplate capacity, latest inventoryOperating nameplate MW in this monthly inventory. Compare it with the annual baseline; do not add the two inventories together.Definition ↗
17.6MW
· provisional
Source & method

Sum of nameplate MW over generators whose current-valid EIA-860M workbook assertion has status OP; dated by the complete inventory edition; never added to the baseline aggregate

2026-08-01 · reported · derived · valid · provisional

5 of 5 current and historical generators included.

Preliminary Monthly Electric Generator Inventory, August 2026; plant_id_eia=50380; report_date=2026-08-01

Publisher & attribution ↗ Cite this released fact ↗
Planned nameplate capacity, latest inventoryNameplate MW proposed or under construction in this monthly inventory, separate from operating MW. Planned dates are forecasts.Definition ↗
Not applicable
· provisional
Source & method

Sum of nameplate MW over generators whose current-valid EIA-860M workbook assertion is a proposal or construction stage (P, L, T, U, V, OT, TS); a proposal is not a commitment and its date is a forecast

2026-08-01 · reported · derived · not_applicable · provisional

5 of 5 current and historical generators included.

Preliminary Monthly Electric Generator Inventory, August 2026; plant_id_eia=50380; report_date=2026-08-01

Publisher & attribution ↗ Cite this released fact ↗
Retired or cancelled nameplate capacity, latest inventory
Not applicable
· provisional
Source & method

Sum of nameplate MW over generators whose current-valid EIA-860M workbook assertion is retired, cancelled or indefinitely postponed (RE, CN, IP); retired is not demolished

2026-08-01 · reported · derived · not_applicable · provisional

5 of 5 current and historical generators included.

Preliminary Monthly Electric Generator Inventory, August 2026; plant_id_eia=50380; report_date=2026-08-01

Publisher & attribution ↗ Cite this released fact ↗

Lifecycle of the units

Each unit's operating span from its reported operating date to its retirement date or to the August 2026 inventory (the vertical line). Dashed spans start at a planned operating date, a forecast; a short bar marks a planned retirement. Standby and out-of-service units are hatched.

Units as a table
Unit lifecycle from EIA-860M, August 2026.
UnitStateOperating sincePlannedRetiredMW
GEN1OperatingJanuary 1936——2MW
GEN2OperatingJanuary 1936——2MW
GEN3OperatingJanuary 1936——2MW
GEN4OperatingJune 1984——5.8MW
GEN5OperatingJune 1984——5.8MW

Independently dated by EIA-860M; the baseline facts above stay the validated edition. Planned dates are forecasts; retired is not demolished.

Claimed in Washington’s fuel mix by

CY2024

Washington Fuel Mix Disclosure claims on this plant for CY2024, the latest year loaded; several suppliers can claim one plant; a claim attributes retail sales, it is not a wire or a share of ownership

Geographic & reporting context

Balancing authority: Avista

Approximate service areasAn approximate utility service area. The boundary cannot identify the supplier for a particular address.Definition ↗ containing the plant’s location. A geographic candidate, not a supply relationship.

Nearby transmission Context, not a connection

Within 3 km of the reported plant point, nearest first. BPA’s published lines, HIFLD-compiled lines of other owners and HIFLD 2022 substations; nearness does not establish an electrical connection.

  • BEACON Substation (HIFLD 2022)
    230 kV · 1.02 km

Additional inventory facts

Generators listed
5count
Source & method

Generator rows for the plant in the inventory year, any status

2024 inventory · reported · derived · valid · final

out_eia__yearly_generators.parquet; report_date=2024-01-01; plant_id_eia=50380

Publisher & attribution ↗ Cite this released fact ↗
Operating generators
5count
Source & method

Generator rows with status code OP

2024 inventory · reported · derived · valid · final

out_eia__yearly_generators.parquet; report_date=2024-01-01; plant_id_eia=50380

Publisher & attribution ↗ Cite this released fact ↗

Sources for this record

Frozen citation page ↗

Existing Hydropower Assets (EHA) Plant Database, 2026 (published 2026-07-06, revised 2026-07-16; DOI 10.21951/EHA_FY2026/3374497)

Megan M. Johnson, Shih-Chieh Kao and Rocio Uría-Martínez. 2026. Existing Hydropower Assets (EHA) Plant Database, 2026. HydroSource. Oak Ridge National Laboratory, Oak Ridge, Tennessee, USA. DOI: 10.21951/EHA_FY2026/3374497

Only the EHA plant identifier, plant name and water body of reviewed rows are republished, as identity beside the EIA plant; EHA capacity and generation are not loaded and never enter any total. An EHA record without an EIA plant id has no entity here.

Hydropower Infrastructure – LAkes, Reservoirs, and RIvers (HILARRI), Version 4 (2026-05-05; DOI 10.21951/HILARRI/3362570; links EHA 2025 plants to NID dams of 2025-08-18, GRanD v1.3, NHDPlusV2 and HUC12)

Hansen, C. H., Matson, P. G., Bozeman, B. B., Turner, S. W. D. 2026. Hydropower Infrastructure – LAkes, Reservoirs, and RIvers (HILARRI) v4. HydroSource. Oak Ridge National Laboratory, Oak Ridge, Tennessee, USA. DOI: 10.21951/HILARRI/3362570

A crosswalk of identifiers, not attributes: the HILARRI row id and its GRanD, NHDPlusV2 flowline and HUC12 ids are republished for reviewed rows only. HILARRI's own quality flags are kept on each row; a link is not a reservoir volume, a flow or a generation series.

National Inventory of Dams, national export dated 2026-09-11 (dam id, name, river, purposes and coordinates used to verify each HILARRI dam link)

U.S. Army Corps of Engineers, National Inventory of Dams (export of 2026-09-11)

The NID id and dam name identify the structure the plant sits at, as HILARRI links it and the 2026-09-11 export confirms it. NID purposes are recorded on the row as the inventory states them (Grand Coulee's NID record lists no hydroelectric purpose). Dam height, storage and hazard fields are not loaded.

PUDL v2026.9.0, out_eia__yearly_plants

Catalyst Cooperative, PUDL v2026.9.0, derived from U.S. EIA Forms 860/923

Data transformed by PUDL from U.S. EIA forms; selected fields republished; EIA data is public with dated acknowledgment (https://www.eia.gov/about/copyrights_reuse.php)

PUDL v2026.9.0, out_eia__yearly_generators

Catalyst Cooperative, PUDL v2026.9.0, derived from U.S. EIA Forms 860/923

Data transformed by PUDL from U.S. EIA forms; selected fields republished; EIA data is public with dated acknowledgment (https://www.eia.gov/about/copyrights_reuse.php)

PUDL v2026.9.0, out_eia860__yearly_ownership

Catalyst Cooperative, PUDL v2026.9.0, derived from U.S. EIA Forms 860/923

Data transformed by PUDL from U.S. EIA forms; selected fields republished; EIA data is public with dated acknowledgment (https://www.eia.gov/about/copyrights_reuse.php)

PUDL v2026.9.0, out_eia923__yearly_generation_fuel_combined

Catalyst Cooperative, PUDL v2026.9.0, derived from U.S. EIA Forms 860/923

Data transformed by PUDL from U.S. EIA forms; selected fields republished; EIA data is public with dated acknowledgment (https://www.eia.gov/about/copyrights_reuse.php)

Release 20260929T050546Z-51ae0f7d3c78 · Record JSON