Captain Jack Substation

About this record

BPA transmission project. A project record with the source’s own status, dates and estimates. A proposal or connection request does not establish operation.

2026-07-29

BPA transmission project

Bonneville Power Administration
Portfolio cycleBPA’s planned transmission upgrades, with published status, cost estimates and expected dates.Definition ↗
GERP 2.0· Central Oregon 500 kV Dynamic Reactive Upgrade
Status
Initiation(filed as “INTIATION”)
Expected energization
2035
Bundle
CENTRAL OR DYNAMIC REACTIVE

This proposed project would install reactive support (STATCOM) for Central Oregon at Bonanza 500kV and a Captain Jack 500 kV. In addition, a new 500kV series capacitor would be added at Fort Rock Compensation Station.

Justification as BPA states it: Will create additional capacity to support regional load growth, reliability needs and commercial requests for long-term transmission

Substations

  • Captain JackCPJK
  • Fort RockFORT
  • BonanzaPOND

A planning bundle in BPA's Grid Expansion and Reinforcement Portfolio: status, expected energization and cost change with each cycle; not a permit, a contract or a route. Proposed new or rebuilt substations as BPA published them for its GERP cycle: expected energization year, estimated cost in dollars and status are planning figures at publication; the point is the existing substation yard or the named site.

Map location unavailable. This plant remains part of the source inventory and tables.

Estimated cost
56,000,000USD
Source & method

The publisher's planning estimate for the project at publication (BPA GERP: nominal dollars as the layer carries it on the bundle, which does not say what it covers; BPA's summaries can state it for a group of projects); not a budget, contract or actual

2026-07-29 · reported · direct · valid · final

BPA's planning estimate as the layer carries it on this bundle at publication; nominal dollars. The layer does not say what it covers; BPA's project summaries can state it for a group of projects (group_name)

Bundle_ID=P06546; layer=substations

Publisher & attribution ↗ Cite this released fact ↗

Geographic & reporting context

A planning bundle in BPA's Grid Expansion and Reinforcement Portfolio: status, expected energization and cost change with each cycle; not a permit, a contract or a route. Proposed new or rebuilt substations as BPA published them for its GERP cycle: expected energization year, estimated cost in dollars and status are planning figures at publication; the point is the existing substation yard or the named site.

Sources for this record

Frozen citation page ↗

Grid Expansion & Reinforcement Portfolio, substation projects (Evolving Grid), layer 10

Bonneville Power Administration, Grid Expansion & Reinforcement Portfolio substation projects (Evolving Grid), 2026

Proposed new or rebuilt substations as BPA published them for its GERP cycle: expected energization year, estimated cost in dollars and status are planning figures at publication; the point is the existing substation yard or the named site.

Release 20260929T050546Z-51ae0f7d3c78 · Record JSON