ProjectWA
Ostrea Solar
About this record
EFSEC-sited facilityin Yakima, WA. A project record with the source’s own status, dates and estimates. A proposal or connection request does not establish operation.
Period not specified
Show on the map ↗
EFSEC-sited facility
Washington Energy Facility Site Evaluation Council - Stage
- Under construction· Permits and compliance in progress; SCA shared with High Top Solar
- Technology
- solar+storage
- Applicant
- Cypress Creek Renewables LLC
- Decision
- Approved by Governor· 2023-04-06· site certification agreement: yes
- Location
- Yakima, WA
EFSEC reviews and recommends; the Governor decides. Figures are the facility page's own.
Map location unavailable. This plant remains part of the source inventory and tables.
Project nameplate capacity as statedThe publisher’s stated project rating. The project’s status determines whether it is operating; a connection request alone does not establish that.Definition ↗ 80MW
Source & method
The figure the issuing record states for the project (BPA queue Nameplate MW Total; EFSEC facility page); a proposal, not operating capacity
Period not specified · reported · curated · valid · final
efsec_facilities.csv; efsec_slug=ostrea-solar; About section states each array up to 80 MW; max-capacity box blank; matches plants.json "Ostrea Solar, LLC", Yakima, operating
Publisher & attribution ↗ Cite this released fact ↗ Geographic & reporting context
EFSEC reviews and recommends; the Governor decides. Figures are the facility page's own.
EFSEC facilities index (pipeline/config/crosswalks/efsec_facilities.csv)
Washington Energy Facility Site Evaluation Council, facility pages
Stage, decision and figures as each EFSEC facility page states them on the review date; EFSEC recommends and the Governor decides; a listed facility is not necessarily built.
Release 20260929T050546Z-51ae0f7d3c78 · Record JSON