ProjectWA

Horse Heaven Wind Project

About this record

EFSEC-sited facilityin Benton, WA. A project record with the source’s own status, dates and estimates. A proposal or connection request does not establish operation.

Period not specified

EFSEC-sited facility

Washington Energy Facility Site Evaluation Council
Stage
Awaiting construction· Project under litigation; up to 222 wind turbines plus solar and BESS
Technology
wind
Applicant
Horse Heaven Wind Farm LLC
Decision
Approved by Governor· 2024-10-18· site certification agreement: yes
Location
Benton, WA

EFSEC reviews and recommends; the Governor decides. Figures are the facility page's own.

Map location unavailable. This plant remains part of the source inventory and tables.

Project nameplate capacity as statedThe publisher’s stated project rating. The project’s status determines whether it is operating; a connection request alone does not establish that.Definition ↗
1,150MW
Source & method

The figure the issuing record states for the project (BPA queue Nameplate MW Total; EFSEC facility page); a proposal, not operating capacity

Period not specified · reported · curated · valid · final

efsec_facilities.csv; efsec_slug=horse-heaven-wind-project; About section; 1150 MW combined wind+solar+BESS, not broken out; not yet in plants.json

Publisher & attribution ↗ Cite this released fact ↗

Geographic & reporting context

EFSEC reviews and recommends; the Governor decides. Figures are the facility page's own.

Sources for this record

Frozen citation page ↗

EFSEC facilities index (pipeline/config/crosswalks/efsec_facilities.csv)

Washington Energy Facility Site Evaluation Council, facility pages

Stage, decision and figures as each EFSEC facility page states them on the review date; EFSEC recommends and the Governor decides; a listed facility is not necessarily built.

Release 20260929T050546Z-51ae0f7d3c78 · Record JSON