ProjectWA
Hop Hill Solar
About this record
EFSEC-sited facilityin Benton, WA. A project record with the source’s own status, dates and estimates. A proposal or connection request does not establish operation.
Period not specified
Show on the map ↗
EFSEC-sited facility
Washington Energy Facility Site Evaluation Council - Stage
- Application review· Found inconsistent with land use regulations 2023-11-15; extension requested
- Technology
- solar+storage· storage 500 MW
- Applicant
- BrightNight, LLC
- Decision
- Pending· site certification agreement: no· applied 2022-12-22
- Location
- Benton, WA
EFSEC reviews and recommends; the Governor decides. Figures are the facility page's own.
Map location unavailable. This plant remains part of the source inventory and tables.
Project nameplate capacity as statedThe publisher’s stated project rating. The project’s status determines whether it is operating; a connection request alone does not establish that.Definition ↗ 500MW
Source & method
The figure the issuing record states for the project (BPA queue Nameplate MW Total; EFSEC facility page); a proposal, not operating capacity
Period not specified · reported · curated · valid · final
efsec_facilities.csv; efsec_slug=hop-hill-solar; About/Recent documents; matches plants.json "Hop Hill Solar Generation and BESS", Benton, planned
Publisher & attribution ↗ Cite this released fact ↗ Geographic & reporting context
EFSEC reviews and recommends; the Governor decides. Figures are the facility page's own.
EFSEC facilities index (pipeline/config/crosswalks/efsec_facilities.csv)
Washington Energy Facility Site Evaluation Council, facility pages
Stage, decision and figures as each EFSEC facility page states them on the review date; EFSEC recommends and the Governor decides; a listed facility is not necessarily built.
Release 20260929T050546Z-51ae0f7d3c78 · Record JSON