Monthly net generation by plant
How much electricity each published plant delivered in each calendar month, from Form EIA-923, for the years in which its operator reported monthly. A plant that reported once a year has no rows for that year, because EIA estimates its monthly values; the annual table covers it.
At a glance
- Period
- 2015-01–2024-12
- One row is
- published plant x report month, for plant-years reported monthly
- Built from source rows of
- plant x prime mover x energy source x report month
- Evidence and method
- reported · derivedPublished only for plants whose reporting_frequency_code is M or AM; annual (A) reporters' monthly values are EIA estimates and are not published as a monthly curve
- Origin
- U.S. EIA Form 923 Schedule 3 monthly (generation and fuel, nuclear combined at plant/prime-mover grain) ↗Source notice and licenceLicence: CC-BY-4.0
- Built from source rows of
- plant x report_date (annual)
- Evidence and method
- reported · derived
- Origin
- U.S. EIA Form 860 (mix of EIA forms, harvested) ↗Source notice and licenceLicence: CC-BY-4.0
- Edition in this release
- PUDL v2026.9.0 (embedded 2026.8.1.dev50) ·
out_eia__yearly_plants· retrieved 2026-09-29PUDL v2026.9.0 (embedded 2026.8.1.dev50) ·out_eia923__monthly_generation_fuel_combined· retrieved 2026-09-29 - Download
- generation_plant_month.parquet ↓25,106 rows · 79 KB
Measures
| Column | Unit | What it measures |
|---|---|---|
net_generation_mwh | MWh | Net generation for the calendar month as reported on Form EIA-923: the sum of the plant's unique prime mover x energy source rows, kept signed. Null when none of the plant's rows for that month carries a value. |
Coverage by year
755 published plants · counts in plant-months| Year | Plants listed | Plant-months listed | With a value | Listed, no value | Monthly / annual / unknown reporters | Final / provisional / unknown |
|---|---|---|---|---|---|---|
| 2015 | 129 | 1,535 | 1,535 | 0 | 129 / 328 / 298 | 1,535 / 0 / 0 |
| 2016 | 133 | 1,563 | 1,563 | 0 | 133 / 342 / 280 | 1,563 / 0 / 0 |
| 2017 | 72 | 842 | 842 | 0 | 72 / 443 / 240 | 842 / 0 / 0 |
| 2018 | 96 | 1,141 | 1,141 | 0 | 96 / 430 / 229 | 1,141 / 0 / 0 |
| 2019 | 99 | 1,170 | 1,170 | 0 | 99 / 437 / 219 | 1,170 / 0 / 0 |
| 2020 | 138 | 1,609 | 1,609 | 0 | 138 / 452 / 165 | 1,609 / 0 / 0 |
| 2021 | 139 | 1,662 | 1,662 | 0 | 139 / 458 / 158 | 1,662 / 0 / 0 |
| 2022 | 141 | 1,657 | 1,657 | 0 | 141 / 470 / 144 | 1,657 / 0 / 0 |
| 2023 | 575 | 6,873 | 6,873 | 0 | 575 / 42 / 138 | 6,873 / 0 / 0 |
| 2024 | 593 | 7,054 | 7,054 | 0 | 594 / 59 / 102 | 7,054 / 0 / 0 |
What is missing, and why
- Listed without a reported valueListed on EIA-923 for the month with no net generation value on any row; published as null with quality missing0 plant-months
- annual_reporterPublished plants whose EIA-923 respondent reported annually for the year. Their monthly values are EIA estimates, so they have no rows here3,461 plant-years
- frequency_unknownPublished plants with no usable reporting frequency for the year; excluded because the build cannot tell a reported month from an estimated one1,973 plant-years
- No row in the sourceMonths of monthly reporters' plant-years with no EIA-923 row. The inventory is one snapshot, so the table cannot tell a plant not yet built or already retired from one that did not report286 plant-months
- Outside the atlas frameEIA-923 monthly rows in the window for plants outside the frame authorities and the core states1,628,027 source rows
- In the source, not yet includedEIA-923 monthly rows for published plants in years outside the window: present in the source edition, not yet included: 2001–2014, 2025–202681,780 source rows
How often it changes
Checked 2026-09-21- Publisher
- EIA releases Form EIA-923 data monthly, and once a year as final annual data.www.eia.gov/electricity/data/eia923/ ↗
- Delay
- On the checked date EIA's latest monthly release, dated August 26, 2026, carried June 2026 data; final 2025 annual data was released September 14, 2026, and the next annual release was listed as September 2027 for 2026 final data.www.eia.gov/electricity/data/eia923/ ↗
- This atlas
- The atlas reads EIA-923 through PUDL, which Catalyst Cooperative publishes as quarterly versioned releases. Each atlas release pins one PUDL version, named under edition; the table changes only when that pin moves. No timed refresh.docs.catalyst.coop/pudl/en/v2026.9.0/data_access.html ↗
Checks and corrections
- Passed
frequency.raw_supplement{"plant_years_by_source":[{"pudl":26,"raw":431,"year":2015},{"pudl":26,"raw":449,"year":2016},{"pudl":25,"raw":490,"year":2017},{"pudl":526,"raw":0,"year":2018},{"pudl":536,"raw":0,"year":2019},{"pudl":590,"raw":0,"year":2020},{"pudl":597,"raw":0,"year":2021},{"pudl":611,"raw":0,"year":2022},{"pudl":617,"raw":0,"year":2023},{"pudl":635,"raw":18,"year":2024}],"workbooks":{"2015":{"locator":"EIA923_Schedules_2_3_4_5_M_12_2015_Final_Revision.xlsx; sheet=Page 6 Plant Frame; column=Reporting Frequency","rows":7547,"unexpected_codes":{}},"2016":{"locator":"EIA923_Schedules_2_3_4_5_M_12_2016_Final_Revision.xlsx; sheet=Page 6 Plant Frame; column=Reporting Frequency","rows":8149,"unexpected_codes":{}},"2017":{"locator":"EIA923_Schedules_2_3_4_5_M_12_2017_Final_Revision.xlsx; sheet=Page 6 Plant Frame; column=Reporting Frequency","rows":8714,"unexpected_codes":{}},"2024":{"locator":"EIA923_Schedules_2_3_4_5_M_12_2024_Final.xlsx; sheet=Page 6 Plant Frame; column=Reporting Frequency","rows":13267,"unexpected_codes":{"AM/A":151}}}}
No corrections apply to this dataset in this release. Earlier editions: not available (earlier releases did not retain per-dataset edition comparisons).
Release 20260929T050546Z-51ae0f7d3c78