Council data-centre and hydrogen load inputs (draft Ninth Power Plan)
The two input workbooks the Northwest Power and Conservation Council publishes beside its draft Ninth Power Plan demand forecast, read cell by cell as published: the incremental load of new data centres and chip fabrication plants under low, mid and high trajectories, and the electric load of producing hydrogen in the Northwest under low and high trajectories. Every value is annual energy in average megawatts (the Council writes aMW; the dictionary unit here is MWa); there is no peak, because the Council leaves hydrogen out of its peak forecast and states the data-centre values as annual energy. Data centres run 2024 to 2046 for the region and 2024 to 2030 by utility, split into data centres only, chip fabs only and both; hydrogen runs 2027 to 2050 for the Northwest and 2027 to 2046 by the Council's own hydrogen zones. Trajectories are the Council's alternatives and are never averaged or summed; a zone is the Council's own label, not the atlas frame or a service territory; a regional series or Total column is the Council's own figure, never a sum made here; a blank cell is not published, never zero. These are inputs to the forecast model, not the DC_Load and H2_Load components of the area workbooks (council-demand-forecast), and the plan is a draft open for public comment.
At a glance
Period
2024–2050
One row is
Input workbook x sheet x trajectory x technology x Council zone or regional series x year
Built from source rows of
trajectory x year (region, 2024-2046); trajectory x technology x utility x year (2024-2030)
Evidence and method
modeled · directIncremental annual energy the Council forecasts for new data centres and chip fabrication plants, an input to its draft Ninth Plan demand forecast. The workbook's own notes say "Load values are annual energy (aMW)" and "Incremental (new) growth forecast, does not include existing tech loads" (text boxes on sheets '20y regional forecasts' and 'Forecast pathways'); aMW is recorded here in the dictionary unit MWa, and there is no peak. Three trajectories, low, mid ("BASE") and high: Appendix F (PDF page 32) states the medium input was used for the Late Growth and Mixed Bag futures, the high input for High Growth and Early Growth, and the low input for Low Growth. They are never averaged or summed. The region runs 2024-2046 ("Post 2030 values are trended upwards at flat rates"); by utility the workbook runs 2024-2030, split into data centres only, chip fabs only and all technologies, under the Council's own utility labels (BPA, PGE, PAC, Chelan, Douglas, Grant, Idaho, NWMT), which are not the atlas frame or a service territory. A blank cell is not published, never zero; the Council's Total column is its own, never a sum made here. This input is not the DC_Load column of the area workbooks, which is the forecast model's output. The plan is draft 2026-3, open for comment through October 16, 2026.
trajectory x year (Northwest, 2027-2050); trajectory x hydrogen zone x year (2027-2046)
Evidence and method
modeled · directElectric load the Council forecasts for producing hydrogen in the Northwest, an input to its draft Ninth Plan demand forecast, in average megawatts as the workbook heads its columns ('NW aMW', 'aMW'), recorded here in the dictionary unit MWa. Energy only: the Council models hydrogen load as curtailable and leaves it out of the peak forecast (Appendix F, PDF page 42). Two trajectories, low and high, described on the sheet 'Pathways'; never averaged or summed. The Northwest series (column J 'NW aMW', 2027-2050) is the load left after the Council's assumption that a growing share of hydrogen is imported or made without electricity (half by 2045, Appendix F PDF page 44); the zone breakouts (2027-2046) split it across the Council's own hydrogen zones (Puget North, BPA OR, BPA WA, Olympia, NWMT, Douglas; the high case adds PACW, Chelan, Grant, PGE, Tacoma, Avista, SCL and Idaho at 2.5% each "for general industrial usage"), which are not the atlas frame or a service territory. The workbook's calculation columns and background sheets are not loaded. This input is not the H2_Load column of the area workbooks. The plan is draft 2026-3, open for comment through October 16, 2026.
Annual energy in average megawatts as the Council states it: the data-centre workbook's notes say "Load values are annual energy (aMW)" and "Incremental (new) growth forecast, does not include existing tech loads"; the hydrogen workbook heads its load columns 'NW aMW' and 'aMW'. The hydrogen Northwest series is the load left after the Council's assumption that a growing share of hydrogen is imported or made without electricity (half by 2045, Appendix F PDF page 44). The workbooks display whole aMW; the table keeps each cell's stored value.
Coverage 2024–2050
1,084 values · 25 council input zones
Rows per year as the source dates them; a row without a date is its own line. For each measure: rows with a value, rows listed without one, rows where it does not apply. Counts are values, not quantities.
Year
council input zones
values
annual energyMWa
2024
10
84
6618 without · 0 n/a
2025
10
84
6618 without · 0 n/a
2026
10
84
6618 without · 0 n/a
2027
25
106
8818 without · 0 n/a
2028
25
106
8818 without · 0 n/a
2029
25
106
8818 without · 0 n/a
2030
25
106
8818 without · 0 n/a
2031
16
25
250 without · 0 n/a
2032
16
25
250 without · 0 n/a
2033
16
25
250 without · 0 n/a
2034
16
25
250 without · 0 n/a
2035
16
25
250 without · 0 n/a
2036
16
25
250 without · 0 n/a
2037
16
25
250 without · 0 n/a
2038
16
25
250 without · 0 n/a
2039
16
25
250 without · 0 n/a
2040
16
25
250 without · 0 n/a
2041
16
25
250 without · 0 n/a
2042
16
25
250 without · 0 n/a
2043
16
25
250 without · 0 n/a
2044
16
25
250 without · 0 n/a
2045
16
25
250 without · 0 n/a
2046
16
25
250 without · 0 n/a
2047
1
2
20 without · 0 n/a
2048
1
2
20 without · 0 n/a
2049
1
2
20 without · 0 n/a
2050
1
2
20 without · 0 n/a
By inputper year
Year
data centre
hydrogen
2024
84
—
2025
84
—
2026
84
—
2027
84
22
2028
84
22
2029
84
22
2030
84
22
2031
3
22
2032
3
22
2033
3
22
2034
3
22
2035
3
22
2036
3
22
2037
3
22
2038
3
22
2039
3
22
2040
3
22
2041
3
22
2042
3
22
2043
3
22
2044
3
22
2045
3
22
2046
3
22
2047
—
2
2048
—
2
2049
—
2
2050
—
2
By trajectoryper year
Year
High
Low
Mid
2024
28
28
28
2025
28
28
28
2026
28
28
28
2027
43
35
28
2028
43
35
28
2029
43
35
28
2030
43
35
28
2031
16
8
1
2032
16
8
1
2033
16
8
1
2034
16
8
1
2035
16
8
1
2036
16
8
1
2037
16
8
1
2038
16
8
1
2039
16
8
1
2040
16
8
1
2041
16
8
1
2042
16
8
1
2043
16
8
1
2044
16
8
1
2045
16
8
1
2046
16
8
1
2047
1
1
—
2048
1
1
—
2049
1
1
—
2050
1
1
—
By technologyper year
Year
chip fabs
data centres
data centres and chip fabs
hydrogen production
2024
27
27
30
—
2025
27
27
30
—
2026
27
27
30
—
2027
27
27
30
22
2028
27
27
30
22
2029
27
27
30
22
2030
27
27
30
22
2031
—
—
3
22
2032
—
—
3
22
2033
—
—
3
22
2034
—
—
3
22
2035
—
—
3
22
2036
—
—
3
22
2037
—
—
3
22
2038
—
—
3
22
2039
—
—
3
22
2040
—
—
3
22
2041
—
—
3
22
2042
—
—
3
22
2043
—
—
3
22
2044
—
—
3
22
2045
—
—
3
22
2046
—
—
3
22
2047
—
—
—
2
2048
—
—
—
2
2049
—
—
—
2
2050
—
—
—
2
By is_region_totalper year
Year
false
true
2024
72
12
2025
72
12
2026
72
12
2027
92
14
2028
92
14
2029
92
14
2030
92
14
2031
20
5
2032
20
5
2033
20
5
2034
20
5
2035
20
5
2036
20
5
2037
20
5
2038
20
5
2039
20
5
2040
20
5
2041
20
5
2042
20
5
2043
20
5
2044
20
5
2045
20
5
2046
20
5
2047
—
2
2048
—
2
2049
—
2
2050
—
2
What is missing, and why
Listed without a reported value · annual energyRows with no value for this measure; published as null, never zero
126 values
In the source, not yet includedWhat each workbook computes its loads from, archived in the pinned file and not loaded: the hydrogen workbook's calculation columns (hydrogen mass in MMT, kilograms, kWh per kilogram, kWh, the load before the in-region share, and that share), its zone shares, and its eleven background sheets (hydrogen hub, Atlas Agro, US DOE, Washington end uses, BNEF, McKinsey, Northwest share, Montana split, two EIA SEDS extracts, population); the data-centre workbook's 'Pathway sources' sheet, which names each utility's forecast source per trajectory.
The plan these workbooks support is a draft: Council document 2026-3, cover date August 12, 2026, published August 13, 2026 and open for public comment through October 16, 2026. Filename labels such as "final 03.16.2025" and "FINAL 04.22.2024" are the publisher's, not the plan's status.www.nwcouncil.org/reports/ninthplan/ ↗www.nwcouncil.org/energy/ninthpowerplan/ ↗
This atlas
Each workbook is pinned by its SHA-256 in the source registry: a changed byte fails acquisition rather than becoming a new edition silently, so the table changes only when a pin is reviewed and moved. No timed refresh.www.nwcouncil.org/energy/ninthpowerplan/technical-elements/ ↗
council_demand_input.rows_valid{"negative_loads":0,"not_annual_energy_in_mwa":0,"rows":1084,"unit":"MWa","unit_locators":{"data_centre":"text boxes on sheets '20y regional forecasts' (anchored at F2) and 'Forecast pathways' (anchored at N2): \"Load values are annual energy (aMW)\"","hydrogen":"column headers 'NW aMW' (sheets 'Ninth Plan forecast LOW' and 'HIGH', J3) and 'aMW' (sheets 'BA breakout LOW' J17 and 'BA breakout HIGH' R24)"},"unknown_missing_reason":0,"unknown_trajectory_or_technology":0,"value_and_reason_inconsistent":0}
Passed
No corrections apply to this dataset in this release. Earlier editions: not available (earlier releases did not retain per-dataset edition comparisons).