Council demand forecast (draft Ninth Power Plan)

The Northwest Power and Conservation Council's frozen-efficiency demand forecast for the draft Ninth Power Plan, from its 28 public area workbooks as published: annual energy in average megawatts (the Council writes aMW; the dictionary unit here is MWa, the year's megawatt-hours divided by the hours in the year) and the annual single-hour peak in MW, for 2027 through 2046, under each of five future pathways and each of three climate-model weather patterns, with the total load broken into its residential, commercial and industrial, incremental data-centre, electric-vehicle and hydrogen components. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards: it is a planning input, not a sales forecast, not an observation of load and not a utility integrated resource plan expectation, and it is never merged with one. Futures and climate models are separate dimensions and are never averaged, summed or collapsed together; energy in MWa is never added to a peak in MW. Areas are the Council's own labels, not the atlas frame and not service territories, and NPCC is the Council's own whole-region aggregate, never a sum of the thirteen area rows made here. The hydrogen component is null with not_published on the peak series, which has no hydrogen column. The plan is a draft open for public comment. The data-centre and hydrogen workbooks in the same folder are the forecast's inputs, with their own trajectories and zones, and are described in their own dataset, council-demand-inputs; the folder's README is the citation for the units.

At a glance

Period
2027–2046
One row is
Council area x future pathway x climate model x forecast year x metric (annual energy or annual peak) x load component
Edition in this release
2026-3-draft · 28 files · retrieved 2026-09-29
Download
The Council's own demand-forecast folder (28 workbooks) ↗The atlas reads these workbooks and describes what they hold; it publishes no copy of them and no table of their rows. Download the files from the Council, whose folder is the published original.
Each source: evidence, method and origin28 sources
Every source this dataset is built from, as each declares itself. Nothing here is summarized across sources.
SourceOne source row isEvidence and method
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook BPA_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual energy the Council forecasts for Bonneville Power Administration, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook BPA_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual peak load the Council forecasts for Bonneville Power Administration, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook ID_IPCO_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual energy the Council forecasts for Idaho Power Company, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook ID_IPCO_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual peak load the Council forecasts for Idaho Power Company, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook MT_NWMT_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual energy the Council forecasts for NorthWestern Corp (portion within region), in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook MT_NWMT_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual peak load the Council forecasts for NorthWestern Corp (portion within region), "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook NPCC_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual energy the Council forecasts for the Council's whole-region aggregate NPCC, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. The Council's NPCC workbooks carry no BA column: every area workbook names its area in column BA, and NPCC's rows start at ClimateModel. The area on each row here is the workbook's own name.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook NPCC_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual peak load the Council forecasts for the Council's whole-region aggregate NPCC, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. The Council's NPCC workbooks carry no BA column: every area workbook names its area in column BA, and NPCC's rows start at ClimateModel. The area on each row here is the workbook's own name.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook OR_PGE_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual energy the Council forecasts for Portland General Electric Co, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook OR_PGE_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual peak load the Council forecasts for Portland General Electric Co, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook PACE_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual energy the Council forecasts for PacificCorp East, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook PACE_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual peak load the Council forecasts for PacificCorp East, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook PACW_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual energy the Council forecasts for PacificCorp West, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook PACW_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual peak load the Council forecasts for PacificCorp West, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_AVA_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual energy the Council forecasts for Avista Corp, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_AVA_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual peak load the Council forecasts for Avista Corp, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_CHPD_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual energy the Council forecasts for PUD Chelan Co, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_CHPD_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual peak load the Council forecasts for PUD Chelan Co, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_DOPD_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual energy the Council forecasts for PUD Douglas Co, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_DOPD_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual peak load the Council forecasts for PUD Douglas Co, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_GCPD_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual energy the Council forecasts for PUD Grant Co, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_GCPD_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual peak load the Council forecasts for PUD Grant Co, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_PSE_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual energy the Council forecasts for Puget Sound Energy, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_PSE_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual peak load the Council forecasts for Puget Sound Energy, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_SCL_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual energy the Council forecasts for Seattle City Light, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_SCL_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual peak load the Council forecasts for Seattle City Light, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_TPWR_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual energy the Council forecasts for City of Tacoma, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.
Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_TPWR_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council"area x future pathway x climate model x year (2027-2046)modeled · directAnnual peak load the Council forecasts for City of Tacoma, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026.

Measures

ColumnUnitWhat it measures
valueMWaAnnual energy the Council forecasts for the area, future pathway, climate model and year, in average megawatts: "the total energy load in megawatt-hours divided by the number of hours in the year" (DemandForecast_README.xlsx Glossary!D3). The component total is the Council's own Total_Load column, never a sum of the components made here; it can differ from them by a unit or two of rounding and is not corrected.
valueMWThe single hour of highest load the Council forecasts for the area, future pathway, climate model and year, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), with the hour itself kept as the workbook prints it in Pacific wall clock with its PST or PDT label. A peak in MW is never added to energy in MWa. The peak workbooks carry no hydrogen column.

Coverage 2027–2046

42,000 values · 14 council areas
Rows per year as the source dates them; a row without a date is its own line. For each measure: rows with a value, rows listed without one, rows where it does not apply. Counts are values, not quantities.
Yearcouncil areasvaluesannual energyMWaannual peakMW
2027142,1001,0500 without · 0 n/a8400 without · 210 n/a
2028142,1001,0500 without · 0 n/a8400 without · 210 n/a
2029142,1001,0500 without · 0 n/a8400 without · 210 n/a
2030142,1001,0500 without · 0 n/a8400 without · 210 n/a
2031142,1001,0500 without · 0 n/a8400 without · 210 n/a
2032142,1001,0500 without · 0 n/a8400 without · 210 n/a
2033142,1001,0500 without · 0 n/a8400 without · 210 n/a
2034142,1001,0500 without · 0 n/a8400 without · 210 n/a
2035142,1001,0500 without · 0 n/a8400 without · 210 n/a
2036142,1001,0500 without · 0 n/a8400 without · 210 n/a
2037142,1001,0500 without · 0 n/a8400 without · 210 n/a
2038142,1001,0500 without · 0 n/a8400 without · 210 n/a
2039142,1001,0500 without · 0 n/a8400 without · 210 n/a
2040142,1001,0500 without · 0 n/a8400 without · 210 n/a
2041142,1001,0500 without · 0 n/a8400 without · 210 n/a
2042142,1001,0500 without · 0 n/a8400 without · 210 n/a
2043142,1001,0500 without · 0 n/a8400 without · 210 n/a
2044142,1001,0500 without · 0 n/a8400 without · 210 n/a
2045142,1001,0500 without · 0 n/a8400 without · 210 n/a
2046142,1001,0500 without · 0 n/a8400 without · 210 n/a
By metricper year
Yearannual energyannual peak
20271,0501,050
20281,0501,050
20291,0501,050
20301,0501,050
20311,0501,050
20321,0501,050
20331,0501,050
20341,0501,050
20351,0501,050
20361,0501,050
20371,0501,050
20381,0501,050
20391,0501,050
20401,0501,050
20411,0501,050
20421,0501,050
20431,0501,050
20441,0501,050
20451,0501,050
20461,0501,050
By componentper year
Yeardata centre incrementalelectric vehiclehydrogen productionresidential commercial industrialtotal
2027420420420420420
2028420420420420420
2029420420420420420
2030420420420420420
2031420420420420420
2032420420420420420
2033420420420420420
2034420420420420420
2035420420420420420
2036420420420420420
2037420420420420420
2038420420420420420
2039420420420420420
2040420420420420420
2041420420420420420
2042420420420420420
2043420420420420420
2044420420420420420
2045420420420420420
2046420420420420420
By future_pathwayper year
YearEarlyGrowthHighGrowthLateGrowthLowGrowthMixedBag
2027420420420420420
2028420420420420420
2029420420420420420
2030420420420420420
2031420420420420420
2032420420420420420
2033420420420420420
2034420420420420420
2035420420420420420
2036420420420420420
2037420420420420420
2038420420420420420
2039420420420420420
2040420420420420420
2041420420420420420
2042420420420420420
2043420420420420420
2044420420420420420
2045420420420420420
2046420420420420420
By climate_modelper year
YearCL-ACL-CCL-G
2027700700700
2028700700700
2029700700700
2030700700700
2031700700700
2032700700700
2033700700700
2034700700700
2035700700700
2036700700700
2037700700700
2038700700700
2039700700700
2040700700700
2041700700700
2042700700700
2043700700700
2044700700700
2045700700700
2046700700700
By is_region_aggregateper year
Yearfalsetrue
20271,950150
20281,950150
20291,950150
20301,950150
20311,950150
20321,950150
20331,950150
20341,950150
20351,950150
20361,950150
20371,950150
20381,950150
20391,950150
20401,950150
20411,950150
20421,950150
20431,950150
20441,950150
20451,950150
20461,950150

What is missing, and why

  • Listed without a reported value · annual energyRows with no value for this measure; published as null, never zero
    0 values
  • Listed without a reported value · annual peakRows with no value for this measure; published as null, never zero
    0 values
  • Not applicable · annual peakRows where NOT (metric = 'annual_peak' AND component = 'hydrogen_production') is false and that carry no value; the measure does not apply to them
    4,200 values
  • not_computedForecast years after 2046. The README describes the forecast as covering 2027 to 2049; the published area workbooks carry 2027 to 2046 and the atlas publishes what the workbooks carry, never an extrapolation.
    Not computedthe acquired workbooks end at 2046

How often it changes

Checked 2026-09-22
Publisher
The Northwest Power Act requires the Council to produce a power plan at least every five years, and the Council posts the supporting demand workbooks to the plan's public folder as the forecast is developed. The Council states no schedule for the workbooks themselves; the README sheet dates itself "Last updated August 08, 2025 / Initial upload June 30, 2025".www.nwcouncil.org/energy/ninthpowerplan/technical-elements/ ↗nwcouncil.box.com/v/ninthplandemndfcastworkbooks ↗
Delay
The plan these workbooks support is a draft: Council document 2026-3, cover date August 12, 2026, published August 13, 2026 and open for public comment through October 16, 2026. A final plan will supersede it, and filename dates such as "final 03.16.2025" are the publisher's labels on individual files, not the plan's status.www.nwcouncil.org/reports/ninthplan/ ↗www.nwcouncil.org/energy/ninthpowerplan/ ↗
This atlas
Each workbook is pinned by its SHA-256 in the source registry: a changed byte fails acquisition rather than becoming a new edition silently, so the table changes only when a pin is reviewed and moved. No timed refresh.www.nwcouncil.org/energy/ninthpowerplan/technical-elements/ ↗

Checks and corrections

  • keys.council_demand_unique{"distinct":42000,"rows":42000}
    Passed
  • council_demand.rows_valid{"negative_loads":0,"peak_hour_on_the_wrong_metric":0,"rows":42000,"unit_locator":"DemandForecast_README.xlsx Glossary!D3","unit_not_the_metrics":0,"units":{"annual_energy":"MWa","annual_peak":"MW"},"unknown_component":0,"unknown_future_or_climate_model":0,"unknown_missing_reason":0,"value_and_reason_inconsistent":0}
    Passed

No corrections apply to this dataset in this release. Earlier editions: not available (earlier releases did not retain per-dataset edition comparisons).

Release 20260929T050546Z-51ae0f7d3c78