| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook BPA_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual energy the Council forecasts for Bonneville Power Administration, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook BPA_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual peak load the Council forecasts for Bonneville Power Administration, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook ID_IPCO_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual energy the Council forecasts for Idaho Power Company, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook ID_IPCO_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual peak load the Council forecasts for Idaho Power Company, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook MT_NWMT_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual energy the Council forecasts for NorthWestern Corp (portion within region), in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook MT_NWMT_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual peak load the Council forecasts for NorthWestern Corp (portion within region), "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook NPCC_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual energy the Council forecasts for the Council's whole-region aggregate NPCC, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. The Council's NPCC workbooks carry no BA column: every area workbook names its area in column BA, and NPCC's rows start at ClimateModel. The area on each row here is the workbook's own name. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook NPCC_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual peak load the Council forecasts for the Council's whole-region aggregate NPCC, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. The Council's NPCC workbooks carry no BA column: every area workbook names its area in column BA, and NPCC's rows start at ClimateModel. The area on each row here is the workbook's own name. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook OR_PGE_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual energy the Council forecasts for Portland General Electric Co, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook OR_PGE_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual peak load the Council forecasts for Portland General Electric Co, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook PACE_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual energy the Council forecasts for PacificCorp East, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook PACE_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual peak load the Council forecasts for PacificCorp East, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook PACW_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual energy the Council forecasts for PacificCorp West, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook PACW_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual peak load the Council forecasts for PacificCorp West, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_AVA_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual energy the Council forecasts for Avista Corp, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_AVA_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual peak load the Council forecasts for Avista Corp, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_CHPD_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual energy the Council forecasts for PUD Chelan Co, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_CHPD_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual peak load the Council forecasts for PUD Chelan Co, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_DOPD_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual energy the Council forecasts for PUD Douglas Co, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_DOPD_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual peak load the Council forecasts for PUD Douglas Co, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_GCPD_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual energy the Council forecasts for PUD Grant Co, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_GCPD_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual peak load the Council forecasts for PUD Grant Co, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_PSE_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual energy the Council forecasts for Puget Sound Energy, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_PSE_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual peak load the Council forecasts for Puget Sound Energy, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_SCL_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual energy the Council forecasts for Seattle City Light, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_SCL_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual peak load the Council forecasts for Seattle City Light, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_TPWR_AnnualEnergy.xlsx (annual energy in aMW; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual energy the Council forecasts for City of Tacoma, in average megawatts — "the total energy load in megawatt-hours divided by the number of hours in the year", which the Council writes aMW and this atlas records in its dictionary unit MWa (DemandForecast_README.xlsx Glossary!D3). aMW is not MW and not MWh. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|
| Draft Ninth Northwest Power Plan, frozen-efficiency demand forecast workbook WA_TPWR_AnnualPeak.xlsx (annual single-hour peak in MW with the peak hour; five sheets, one per future pathway; rows by climate model and year 2027-2046) ↗Notice and licenceLicence: No reuse grant and no prohibition stated: the Council's Terms & Conditions page says only that website content is information and is not legal or professional advice; the site footer carries "© NW Power & Conservation Council" | area x future pathway x climate model x year (2027-2046) | modeled · directAnnual peak load the Council forecasts for City of Tacoma, "reported in single hour MW units" (DemandForecast_README.xlsx Glossary!D3), beside the hour of that peak exactly as the workbook prints it, with the Pacific timezone abbreviation the Council wrote (PST or PDT); the hour is kept as text and never re-zoned or resolved to an instant here. A single-hour MW peak is never added to an aMW energy figure. Peak workbooks carry no hydrogen column. Frozen efficiency means equipment efficiency is held fixed so the Council's resource model can choose cost-effective efficiency afterwards (Glossary!B3): a planning input, not a sales forecast, not an observation and not a utility IRP expectation, and never merged with one. Total_Load is the Council's own column (RCI + DC + EV + H2 load as published), never a sum made here; it can differ from its components by a unit or two of rounding, which is not corrected. DC_Load is incremental data-centre load from 2025 and existing data centres sit in RCI_Load (Glossary!E27). Area labels are the Council's own, not the atlas frame and not a service territory; NPCC is the Council's regional aggregate ("not a BA but the aggregation of all the regional BAs", Glossary!H17) and is never added to the thirteen area rows. The five future pathways and the three climate models are separate dimensions: never averaged, summed or collapsed into one another. The plan is draft 2026-3, open for comment through October 16, 2026. |
|---|