 "aliases": [
  {
   "relation": "exact",
   "review_state": "source",
   "source_entity_id": "G0511",
   "source_ref": "bpa-queue"
  },
  {
   "note": "basis issuer_request_number; LBNL's row for the same provider and request number, kept as its own account",
   "relation": "candidate",
   "review_state": "candidate",
   "source_entity_id": "BPA:G0511",
   "source_ref": "lbnl-queue"
  }
 ],
 "citation_path": "citations/project~bpaq~G0511.html",
 "components": [
  {
   "fuel_source": "Water",
   "generator_type": "Hydro",
   "nameplate_mw": 39.0
  }
 ],
 "dates": {
  "agreed_in_service": "2019-03-04",
  "note": "Requested and agreed in-service dates are the requestor's and BPA's expectations, not commitments",
  "precision": "day",
  "requested_in_service": "1987-04-10"
 },
 "facts": [
  {
   "basis": "The figure the issuing record states for the project (BPA queue Nameplate MW Total; EFSEC facility page); a proposal, not operating capacity",
   "coverage": null,
   "denominator": null,
   "evidence": "reported",
   "fact_id": "project:bpaq:G0511#project_nameplate_mw",
   "label": "Project nameplate capacity as stated",
   "locator": "Interconnection Request Queue (generator interconnection and line/load requests), published workbook; request_number=G0511; field=Nameplate MW Total",
   "maturity": "final",
   "method": "direct",
   "metric": "project_nameplate_mw",
   "missing_reason": null,
   "note": null,
   "period": {
    "as_of": "2026-09-28",
    "kind": "instant",
    "note": "As stated in the BPA queue workbook at acquisition"
   },
   "precision": 1,
   "quality": "valid",
   "source_ref": "bpa-queue",
   "unit": "MW",
   "value": 39.0
  },
  {
   "basis": "BPA queue Max Summer Interconnection Service MW: the service the requestor asked for, which can differ from nameplate",
   "coverage": null,
   "denominator": null,
   "evidence": "reported",
   "fact_id": "project:bpaq:G0511#project_interconnection_mw",
   "label": "Maximum summer interconnection service requested",
   "locator": "Interconnection Request Queue (generator interconnection and line/load requests), published workbook; request_number=G0511; field=Max Summer Interconnection Service MW",
   "maturity": "final",
   "method": "direct",
   "metric": "project_interconnection_mw",
   "missing_reason": null,
   "note": null,
   "period": {
    "as_of": "2026-09-28",
    "kind": "instant",
    "note": "As stated in the BPA queue workbook at acquisition"
   },
   "precision": 1,
   "quality": "valid",
   "source_ref": "bpa-queue",
   "unit": "MW",
   "value": 39.0
  }
 ],
 "id": "project:bpaq:G0511",
 "issuer": "Bonneville Power Administration",
 "kind": "queue_request",
 "kind_label": "BPA interconnection request",
 "lifecycle": {
  "candidates": [
   {
    "basis": "issuer_request_number",
    "corroboration": {
     "mw_agrees": true,
     "mw_lbnl": 39.0,
     "outcomes_agree": true,
     "request_date_days_apart": 0
    },
    "elapsed_days": {
     "request_to_agreement": 272,
     "request_to_observation": null,
     "request_to_operation": null,
     "request_to_withdrawal": null,
     "unit": "days"
    },
    "milestones": {
     "agreement": "2016-04-27",
     "operation": null,
     "precision": "day",
     "requested": "2015-07-30",
     "withdrawn": null
    },
    "observed_through": "2025-12-24",
    "outcome": "operational",
    "outcome_label": "Operational: the provider reports the request in service or energized",
    "phase_raw": "IA Executed",
    "project_name": "Smith Creek",
    "provider": "BPA",
    "request_id": "G0511",
    "request_key": "lbnl-queue:BPA:G0511",
    "resource": "Hydro",
    "source_ref": "lbnl-queue",
    "status_raw": "operational"
   }
  ],
  "elapsed_days": {
   "request_to_agreement": null,
   "request_to_observation": null,
   "request_to_operation": null,
   "request_to_withdrawal": null,
   "unit": "days"
  },
  "events": [
   {
    "capacity_mw": 2.1,
    "date": "1989-12",
    "date_kind": "actual",
    "generator_id": "GEN3",
    "kind": "operating",
    "locator": "latest_generator; plant_id_eia=54249; generator_id=GEN3; column=operating_date",
    "note": "The unit's own month; it predates this request, which concerns an existing unit",
    "plant_id_eia": 54249,
    "precision": "month",
    "source_ref": "eia860m-inventory",
    "status_code": "OP"
   },
   {
    "capacity_mw": 18.0,
    "date": "1990-01",
    "date_kind": "actual",
    "generator_id": "GEN1",
    "kind": "operating",
    "locator": "latest_generator; plant_id_eia=54249; generator_id=GEN1; column=operating_date",
    "note": "The unit's own month; it predates this request, which concerns an existing unit",
    "plant_id_eia": 54249,
    "precision": "month",
    "source_ref": "eia860m-inventory",
    "status_code": "OP"
   },
   {
    "capacity_mw": 18.0,
    "date": "1990-01",
    "date_kind": "actual",
    "generator_id": "GEN2",
    "kind": "operating",
    "locator": "latest_generator; plant_id_eia=54249; generator_id=GEN2; column=operating_date",
    "note": "The unit's own month; it predates this request, which concerns an existing unit",
    "plant_id_eia": 54249,
    "precision": "month",
    "source_ref": "eia860m-inventory",
    "status_code": "OP"
   },
   {
    "date": "2015-07-30",
    "date_kind": "actual",
    "kind": "requested",
    "locator": "queue_request; request_number=G0511; field=Request Date",
    "note": null,
    "precision": "day",
    "source_ref": "bpa-queue"
   },
   {
    "date": "2016-04-27",
    "date_kind": "actual",
    "kind": "agreement",
    "locator": "queue_request_lbnl; entity=BPA; q_id=G0511; column=ia_date",
    "note": "LBNL's account of the same request number",
    "precision": "day",
    "source_ref": "lbnl-queue"
   },
   {
    "date": "2019-03-04",
    "date_kind": "expected",
    "kind": "agreed_in_service",
    "locator": "queue_request; request_number=G0511; field=Agreed To: (Blank=TBD)",
    "note": "BPA's agreed in-service date, an expectation, not a commitment or an event",
    "precision": "day",
    "source_ref": "bpa-queue"
   }
  ],
  "milestones": {
   "agreement": null,
   "note": "BPA's workbook dates the request and the expected in-service only; agreement, energization and withdrawal are statuses without dates",
   "operation": null,
   "precision": "day",
   "requested": "2015-07-30",
   "withdrawn": null
  },
  "note": "The outcome is BPA's status mapped to the common vocabulary, with the status kept beside it. A candidate is LBNL's row carrying this request number: its dates and status are LBNL's account of the same request as of its own cutoff, shown beside BPA's and never merged into it.",
  "observed_through": "2026-09-28",
  "outcome": "operational",
  "outcome_label": "Operational: the provider reports the request in service or energized",
  "request_kind": "generation",
  "source_ref": "bpa-queue",
  "status_raw": "ENERGIZED"
 },
 "links": {
  "disposition": {
   "basis": "A link needs a cited public source that identifies the facility, and the state, county and resource both accounts give agree; a name is never enough. Each account keeps its own MW and status; nothing is summed across sources. Elapsed time runs from the request month to EIA's operating month, only for a new plant or a phase, because an uprate, a repower or an agreement for a running plant did not create the unit.",
   "disposition": "linked",
   "disposition_label": "Linked: a cited public source identifies the facility, and the state, county and resource both accounts give agree",
   "elapsed_applies": false,
   "elapsed_unit": "months",
   "identity": {
    "checked": "2026-09-27",
    "corroboration_url": null,
    "statement": "EWEB board memo, 2015-11-03: the sale of the 38 MW Smith Creek Hydro Project (powerhouse built 1990) required executing and assigning an interconnection agreement with BPA",
    "url": "https://www.eweb.org/documents/board-meetings/2015/11-03-15/CC4_ResNo.1508%20-%20AuthorizingPowerPurchaseTransaction.pdf"
   },
   "note": "BPA's workbook: EWEB's request at BPA's Bonners Ferry Substation, 39 MW, 2015-07-30: 'Existing hydro generation currently in full operation.' EIA's Smith Falls Hydro Project (54249; GEN1 and GEN2 18 MW, GEN3 2.1 MW; operator City of Eugene, then Smith Creek Hydro, LLC) has run since 1989-12 and lists 38.1 MW in every EIA-860 report year 2001-2026 (PUDL v2026.9.0 out_eia__yearly_generators): an agreement for a running plant, with no capacity change. BPA's 39 MW and EIA's 38.1 MW are each source's own",
   "reason": null,
   "reason_label": null,
   "relation": "agreement",
   "relation_label": "Agreement: a request for a plant already running, with no capacity change; the request did not create its generators",
   "request": {
    "county": "Boundary",
    "date": "2015-07-30",
    "mw": 39.0,
    "mw_basis": "bpa Nameplate MW Total",
    "resource": "Water",
    "source_ref": "bpa-queue",
    "state": "ID"
   },
   "reviewed_on": "2026-09-28",
   "reviewer": "claude-w11",
   "source_ref": "queue-generator-links",
   "units": [
    {
     "checks": {
      "county_agrees": true,
      "operation_on_or_after_request": false,
      "resource_agrees": true,
      "state_agrees": true
     },
     "county": "Boundary",
     "generator_id": "GEN1",
     "months_request_to_operation": null,
     "mw": 18.0,
     "mw_basis": "EIA nameplate MW of this unit (latest_generator)",
     "operating_month": "1990-01",
     "plant": {
      "id": "plant:eia:54249",
      "name": "Smith Falls Hydro Project"
     },
     "plant_id_eia": 54249,
     "resource_group": "hydro",
     "retirement_month": null,
     "source_ref": "eia860m-inventory",
     "state": "ID",
     "status_code": "OP"
    },
    {
     "checks": {
      "county_agrees": true,
      "operation_on_or_after_request": false,
      "resource_agrees": true,
      "state_agrees": true
     },
     "county": "Boundary",
     "generator_id": "GEN2",
     "months_request_to_operation": null,
     "mw": 18.0,
     "mw_basis": "EIA nameplate MW of this unit (latest_generator)",
     "operating_month": "1990-01",
     "plant": {
      "id": "plant:eia:54249",
      "name": "Smith Falls Hydro Project"
     },
     "plant_id_eia": 54249,
     "resource_group": "hydro",
     "retirement_month": null,
     "source_ref": "eia860m-inventory",
     "state": "ID",
     "status_code": "OP"
    },
    {
     "checks": {
      "county_agrees": true,
      "operation_on_or_after_request": false,
      "resource_agrees": true,
      "state_agrees": true
     },
     "county": "Boundary",
     "generator_id": "GEN3",
     "months_request_to_operation": null,
     "mw": 2.1,
     "mw_basis": "EIA nameplate MW of this unit (latest_generator)",
     "operating_month": "1989-12",
     "plant": {
      "id": "plant:eia:54249",
      "name": "Smith Falls Hydro Project"
     },
     "plant_id_eia": 54249,
     "resource_group": "hydro",
     "retirement_month": null,
     "source_ref": "eia860m-inventory",
     "state": "ID",
     "status_code": "OP"
    }
   ]
  },
  "note": "Reviewed: a cited public source identifies the facility, and the state, county and resource both accounts give agree",
  "plants": [
   {
    "generators": [
     "GEN1",
     "GEN2",
     "GEN3"
    ],
    "id": "plant:eia:54249",
    "match_method": "reviewed: a cited identity source; state, county and resource agree where both accounts give them",
    "name": "Smith Falls Hydro Project",
    "relation": "agreement"
   }
  ]
 },
 "location": {
  "county": "Boundary",
  "lat": null,
  "lon": null,
  "note": "The queue names a county and a point of interconnection, not coordinates",
  "quality": "county_only",
  "state": "ID"
 },
 "name": "Smith Creek",
 "note": "A queue request is a request for interconnection service, not a plant: many requests can describe one facility, requests are withdrawn or restudied, and an energized request does not name the operating plant. Request numbers and study milestones are BPA's; nameplate and interconnection MW are the requestor's figures. No location beyond county and the named point of interconnection.",
 "release_id": "20260929T050546Z-51ae0f7d3c78",
 "request": {
  "cluster": null,
  "connection_type": "GI",
  "connection_type_label": "Generator interconnection",
  "date": "2015-07-30",
  "interconnection_type": "NRIS",
  "number": "G0511",
  "point_of_interconnection": "BPA's Bonners Ferry Substation",
  "related_transmission_request": null,
  "replacement": null,
  "repower": null,
  "requestor": "Eugene Water & Electric Board",
  "surplus": false
 },
 "resource_group": "hydro",
 "schema_version": "1.41.0",
 "source_name": null,
 "sources": [
  "bpa-queue",
  "eia860m-inventory",
  "lbnl-queue",
  "queue-generator-links"
 ],
 "status": {
  "code": "ENERGIZED",
  "comments": "Existing hydro generation currently in full operation.",
  "reason_not_completed": ".",
  "stage": "energized"
 },
 "studies": {
  "facilities_study": null,
  "feasibility_study": null,
  "phase_1_cluster_study": null,
  "phase_2_cluster_study": null,
  "system_impact_study": null
 },
 "type": "project",
 "updated_reason": null
}