 "aliases": [
  {
   "note": "XRefCd, BPA's line code, published on this feature only; the entity id",
   "relation": "exact",
   "review_state": "source",
   "source_entity_id": "SHUL-RAVE-3",
   "source_ref": "bpa-lines"
  },
  {
   "edition": "2026-09-26T16:01:28Z",
   "note": "GlobalID: BPA regenerates it at every reload, so it names this feature only in the layer reloaded at `edition`",
   "relation": "exact",
   "review_state": "source",
   "source_entity_id": "9e27a406-9a32-44b9-9362-dd0acc84994d",
   "source_ref": "bpa-lines"
  }
 ],
 "bbox": [
  -121.93356701933618,
  47.12022622485529,
  -120.51049039482855,
  47.362930961078746
 ],
 "citation_path": "citations/line~bpa~SHUL-RAVE-3.html",
 "dossier": {
  "equipment": [
   {
    "as_of": "2026-08-25",
    "assertion_id": "shul-rave-3-series-cap-tp2025",
    "basis": "Equipment BPA names on this line; the capacitor's rating is not published",
    "curation": {
     "checked": "2026-09-27",
     "review_after": "2027-08-25",
     "review_due": false,
     "reviewer": "claude-w51"
    },
    "document": "2025 Transmission Plan (final), section 9.4, Schultz-Raver Series Capacitors",
    "fact": null,
    "holder": null,
    "locator": "PDF p. 88",
    "missing_reason": null,
    "note": "That project (bundle P04364, estimated cost 50,300,000 USD, expected energization 2029) works on the No 4 line's capacitor, not this line's.",
    "source_publisher": "Bonneville Power Administration, Transmission Planning",
    "source_ref": "bpa-line-evidence",
    "source_url": "https://www.bpa.gov/-/media/Aep/transmission/attachment-k/2025-BPA-Transmission-Plan_Final.pdf",
    "statement": "The plan's Schultz-Raver Series Capacitors project upgrades \"the 500 kV series capacitor on the Schultz-Raver #4 500 kV line … to its ultimate rating to match the 500 kV series capacitor on the Schultz-Raver #3 500 kV line\": this line carries a 500 kV series capacitor.",
    "topic": "equipment",
    "unit": null,
    "value": null
   },
   {
    "as_of": "2026-09-27",
    "assertion_id": "shul-rave-3-structures-2026-09",
    "basis": "Structure points BPA publishes under the line's name, counted on the retrieval date; BPA does not define the symbol codes, so no structure type is read from them",
    "curation": {
     "checked": "2026-09-27",
     "review_after": "2027-03-27",
     "review_due": false,
     "reviewer": "claude-w51"
    },
    "document": "BPA_TransmissionStructure_View, layer 0 (reloaded 2026-09-26)",
    "fact": {
     "basis": "Structure points BPA publishes under the line's name, counted on the retrieval date; BPA does not define the symbol codes, so no structure type is read from them",
     "coverage": null,
     "denominator": null,
     "evidence": "reported",
     "fact_id": "line:bpa:SHUL-RAVE-3/evidence/shul-rave-3-structures-2026-09#line_structures_published",
     "label": "Structure points BPA publishes",
     "locator": "shul-rave-3-structures-2026-09; BPA_TransmissionStructure_View, layer 0 (reloaded 2026-09-26); where OperatingLineNm = 'Schultz-Raver No 3'; returnCountOnly, and counts by StrcSymbolCd; https://services3.arcgis.com/Iz3chmSt4P7oOoZy/arcgis/rest/services/BPA_TransmissionStructure_View/FeatureServer/0/query?where=OperatingLineNm%3D%27Schultz-Raver+No+3%27&returnCountOnly=true&f=json",
     "maturity": "final",
     "method": "curated",
     "metric": "line_structures_published",
     "missing_reason": null,
     "note": "The layer names the line, not its XRefCd, and reloads like the line layer; the atlas does not acquire it.",
     "period": {
      "as_of": "2026-09-27",
      "kind": "instant"
     },
     "precision": 0,
     "quality": "valid",
     "source_ref": "bpa-line-evidence",
     "unit": "count",
     "value": 366.0
    },
    "holder": null,
    "locator": "where OperatingLineNm = 'Schultz-Raver No 3'; returnCountOnly, and counts by StrcSymbolCd",
    "missing_reason": null,
    "note": "The layer names the line, not its XRefCd, and reloads like the line layer; the atlas does not acquire it.",
    "source_publisher": "Bonneville Power Administration, Geospatial Services",
    "source_ref": "bpa-line-evidence",
    "source_url": "https://services3.arcgis.com/Iz3chmSt4P7oOoZy/arcgis/rest/services/BPA_TransmissionStructure_View/FeatureServer/0/query?where=OperatingLineNm%3D%27Schultz-Raver+No+3%27&returnCountOnly=true&f=json",
    "statement": "BPA's public structure layer lists 366 structure points under the operating line name \"Schultz-Raver No 3\": symbol code LTS on 361, LTR on 3 and B on 2.",
    "topic": "equipment",
    "unit": "count",
    "value": 366.0
   }
  ],
  "not_reported": [
   {
    "holder": "BPA",
    "label": "Conductor",
    "note": "Conductor type, size and bundling are not in BPA's public line layer; a planned reconductor names no conductor.",
    "source_url": null,
    "topic": "conductor"
   },
   {
    "holder": "BPA",
    "label": "Structure design",
    "note": "BPA publishes structure points by line name in a separate layer with a symbol code it does not define; designs, heights and circuit arrangement are not published. The atlas does not acquire that layer.",
    "source_url": "https://services3.arcgis.com/Iz3chmSt4P7oOoZy/arcgis/rest/services/BPA_TransmissionStructure_View/FeatureServer/0",
    "topic": "structures"
   },
   {
    "holder": "BPA",
    "label": "Ratings",
    "note": "Thermal and operating ratings (MVA or amperes) are not in any public BPA layer. A path's transfer capability limits the whole cut and is never this line's rating.",
    "source_url": null,
    "topic": "ratings"
   },
   {
    "holder": "BPA Transmission Services",
    "label": "Available capacity",
    "note": "BPA calculates available transfer capability per flowgate or path, not per line (ATC Implementation Document); a line has no available-capacity figure of its own.",
    "source_url": "https://www.bpa.gov/-/media/Aep/transmission/atc-methodology/ATCID_V88_11FEB2026.pdf",
    "topic": "available_capacity"
   },
   {
    "holder": "BPA",
    "label": "Outages",
    "note": "BPA posts outage plans and its outage policy on its Outage Coordination site (ATC Implementation Document, section V); outages of this line are not collected here.",
    "source_url": "https://www.bpa.gov/energy-and-services/transmission/outage-coordination",
    "topic": "outages"
   },
   {
    "holder": "BPA",
    "label": "Flow",
    "note": "BPA publishes metered flow per path, not per line; a path's flow is never attributable to one of its lines.",
    "source_url": "https://transmission.bpa.gov/business/operations/Paths/default.aspx",
    "topic": "flows"
   },
   {
    "holder": "BPA",
    "label": "In-service date and edit history",
    "note": "The layer's CreationDate and EditDate are stamped on every feature at each weekly reload: they date the reload, not this line's construction or last change.",
    "source_url": null,
    "topic": "history"
   }
  ],
  "owner": {
   "note": "BPA publishes the line in its own layer; its own document states the ownership. No document read names an operator separately.",
   "operator_stated": false,
   "statements": [
    {
     "as_of": "2026-02-11",
     "assertion_id": "shul-rave-3-owner-atcid88",
     "basis": "Ownership as BPA's ATC Implementation Document states it; no document read names an operator separately",
     "curation": {
      "checked": "2026-09-27",
      "review_after": "2027-02-11",
      "review_due": false,
      "reviewer": "claude-w51"
     },
     "document": "Available Transfer Capability Implementation Document, Version 88 (effective 2026-02-11)",
     "fact": null,
     "holder": null,
     "locator": "PDF p. 8, flow-based path table, Cross Cascades North",
     "missing_reason": null,
     "note": "The same row names Puget Sound Energy's Rocky Reach-Cascade 230-kV as the path's one line BPA does not own.",
     "source_publisher": "Bonneville Power Administration, Transmission Services",
     "source_ref": "bpa-line-evidence",
     "source_url": "https://www.bpa.gov/-/media/Aep/transmission/atc-methodology/ATCID_V88_11FEB2026.pdf",
     "statement": "BPA lists the line among the BPA-owned lines of its Cross Cascades North E>W flow-based path (OASIS path C-CASC_N): \"BPA-Owned Transmission Lines: Schultz-Raver #1, #3, & #4 500-kV\".",
     "topic": "owner",
     "unit": null,
     "value": null
    }
   ]
  },
  "paths": [
   {
    "id": "path:bpa:west-of-cascades-north",
    "name": "West of Cascades North",
    "relation": "curated",
    "reviewed_on": "2026-09-18",
    "reviewer": "claude-1d5",
    "source_publisher": "BPA Transmission Services",
    "source_ref": "bpa-paths",
    "source_url": "https://www.bpa.gov/-/media/Aep/transmission/atc-methodology/ATCID_V88_11FEB2026.pdf",
    "type": "path"
   }
  ],
  "paths_note": "A reviewed row of crosswalks/bpa_paths.csv names this line in the path. A path's transfer capability limits the whole cut, never this line.",
  "paths_stated": [
   {
    "as_of": "2026-08-25",
    "assertion_id": "shul-rave-3-path-tp2025",
    "basis": "Path membership as BPA's plan states it; the atlas's path relation is the reviewed row west-of-cascades-north of crosswalks/bpa_paths.csv",
    "curation": {
     "checked": "2026-09-27",
     "review_after": "2027-08-25",
     "review_due": false,
     "reviewer": "claude-w51"
    },
    "document": "2025 Transmission Plan (final), section 9.4 West of Cascades North Path",
    "fact": null,
    "holder": null,
    "locator": "PDF p. 88",
    "missing_reason": null,
    "note": "BPA's Cross Cascades North flowgate is its share of the path (ATC Implementation Document V88, PDF p. 8).",
    "source_publisher": "Bonneville Power Administration, Transmission Planning",
    "source_ref": "bpa-line-evidence",
    "source_url": "https://www.bpa.gov/-/media/Aep/transmission/attachment-k/2025-BPA-Transmission-Plan_Final.pdf",
    "statement": "\"The West of Cascades North (WOCN) Path spans the northern Cascades Mountain range in Washington State … It is comprised of system elements owned by BPA and PSE and only flows in the east-to-west direction. This path consists of the following transmission lines: … Schultz-Raver #1, #3, and #4 500 kV lines (BPA)\".",
    "topic": "path",
    "unit": null,
    "value": null
   }
  ],
  "planned_work": [
   {
    "as_of": "2026-01-23",
    "assertion_id": "shul-rave-3-gerp10-summary",
    "basis": "Preliminary estimated direct cost BPA states for the three Cross Cascades North Upgrades together: this reconductor, a new capacitor at Paul Substation and a new static VAR compensator at Olympia Substation. Not this line's cost",
    "curation": {
     "checked": "2026-09-27",
     "review_after": "2027-01-23",
     "review_due": false,
     "reviewer": "claude-w51"
    },
    "document": "Grid Expansion and Reinforcement Portfolio (GERP) 1.0 Project Summaries (updated 1/23/26), Cross Cascades North Upgrades",
    "fact": {
     "basis": "Preliminary estimated direct cost BPA states for the three Cross Cascades North Upgrades together: this reconductor, a new capacitor at Paul Substation and a new static VAR compensator at Olympia Substation. Not this line's cost",
     "coverage": null,
     "denominator": null,
     "evidence": "reported",
     "fact_id": "line:bpa:SHUL-RAVE-3/evidence/shul-rave-3-gerp10-summary#line_planned_work_cost_usd",
     "label": "Cost stated for planned work",
     "locator": "shul-rave-3-gerp10-summary; Grid Expansion and Reinforcement Portfolio (GERP) 1.0 Project Summaries (updated 1/23/26), Cross Cascades North Upgrades; PDF p. 2; https://www.bpa.gov/-/media/Aep/transmission/Grid-Expansion-and-Reinforcement-Portfolio-GERP/GERP-10-Project-Summaries.pdf",
     "maturity": "final",
     "method": "curated",
     "metric": "line_planned_work_cost_usd",
     "missing_reason": null,
     "note": "BPA's GERP line layer carries the same 400,000,000 on bundle P05470's Schultz-Raver No 3 row.",
     "period": {
      "as_of": "2026-01-23",
      "kind": "instant"
     },
     "precision": 0,
     "quality": "valid",
     "source_ref": "bpa-line-evidence",
     "unit": "USD",
     "value": 400000000.0
    },
    "holder": null,
    "locator": "PDF p. 2",
    "missing_reason": null,
    "note": "BPA's GERP line layer carries the same 400,000,000 on bundle P05470's Schultz-Raver No 3 row.",
    "source_publisher": "Bonneville Power Administration",
    "source_ref": "bpa-line-evidence",
    "source_url": "https://www.bpa.gov/-/media/Aep/transmission/Grid-Expansion-and-Reinforcement-Portfolio-GERP/GERP-10-Project-Summaries.pdf",
    "statement": "Schultz-Raver 500 kV Line Upgrade: \"BPA proposes upgrading the existing Schultz-Raver #3 and Schultz-Raver #4 500 kV lines to a higher-rated capacity. BPA would reconductor the 77 miles of line (154 miles total) between BPA's Schultz Substation (Ellensburg, WA) and Raver Substation (Ravensdale, WA).\" Estimated completion: 2032 (updated from 2030).",
    "topic": "planned_work",
    "unit": "USD",
    "value": 400000000.0
   },
   {
    "as_of": "2026-04-29",
    "assertion_id": "shul-rave-3-qsr-fy26q2",
    "basis": "BPA's quarterly capital report withholds the project's authorized and forecast cost",
    "curation": {
     "checked": "2026-09-27",
     "review_after": "2027-01-31",
     "review_due": false,
     "reviewer": "claude-w51"
    },
    "document": "Major Capital Projects, End-of-Project Target Performance, Quarterly Status Report – Q2 2026",
    "fact": {
     "basis": "BPA's quarterly capital report withholds the project's authorized and forecast cost",
     "coverage": null,
     "denominator": null,
     "evidence": "reported",
     "fact_id": "line:bpa:SHUL-RAVE-3/evidence/shul-rave-3-qsr-fy26q2#line_planned_work_cost_usd",
     "label": "Cost stated for planned work",
     "locator": "shul-rave-3-qsr-fy26q2; Major Capital Projects, End-of-Project Target Performance, Quarterly Status Report – Q2 2026; PDF p. 3; footnote 4, PDF p. 11; https://www.bpa.gov/-/media/Aep/finance/asset-management/public-materials-project-synopsis/fy-2026-q2-fc-quarterly-project-status-report-package-public-report.pdf",
     "maturity": "final",
     "method": "curated",
     "metric": "line_planned_work_cost_usd",
     "missing_reason": "withheld",
     "note": "BPA: \"N/A indicates contracts have not been awarded - cost estimates are confidential\" (footnote 4)",
     "period": {
      "as_of": "2026-04-29",
      "kind": "instant"
     },
     "precision": 0,
     "quality": "withheld",
     "source_ref": "bpa-line-evidence",
     "unit": "USD",
     "value": null
    },
    "holder": "BPA: \"N/A indicates contracts have not been awarded - cost estimates are confidential\" (footnote 4)",
    "locator": "PDF p. 3; footnote 4, PDF p. 11",
    "missing_reason": "withheld",
    "note": "as_of is the PDF's creation date. BPA publishes this report each quarter; a later one may carry an authorized cost.",
    "source_publisher": "Bonneville Power Administration",
    "source_ref": "bpa-line-evidence",
    "source_url": "https://www.bpa.gov/-/media/Aep/finance/asset-management/public-materials-project-synopsis/fy-2026-q2-fc-quarterly-project-status-report-package-public-report.pdf",
    "statement": "Tier 1 GERP Schultz-Raver Reconductor: \"Reconductor Schultz – Raver Line for Cross Cascades North initiative.\" Authorized and forecast direct capital: N/A.",
    "topic": "planned_work",
    "unit": null,
    "value": null
   },
   {
    "as_of": "2026-08-25",
    "assertion_id": "shul-rave-3-tp2025-reconductor",
    "basis": "Estimated Cost of that plan of service as a whole, in direct costs without overheads, or typical costs of similar projects where no official estimate exists (plan, PDF p. 39). Not this line's cost",
    "curation": {
     "checked": "2026-09-27",
     "review_after": "2027-08-25",
     "review_due": false,
     "reviewer": "claude-w51"
    },
    "document": "2025 Transmission Plan (final), section 9.4, Schultz-Raver Reconductor and Paul Capacitor",
    "fact": {
     "basis": "Estimated Cost of that plan of service as a whole, in direct costs without overheads, or typical costs of similar projects where no official estimate exists (plan, PDF p. 39). Not this line's cost",
     "coverage": null,
     "denominator": null,
     "evidence": "reported",
     "fact_id": "line:bpa:SHUL-RAVE-3/evidence/shul-rave-3-tp2025-reconductor#line_planned_work_cost_usd",
     "label": "Cost stated for planned work",
     "locator": "shul-rave-3-tp2025-reconductor; 2025 Transmission Plan (final), section 9.4, Schultz-Raver Reconductor and Paul Capacitor; PDF p. 88; project lists PDF pp. 85 and 103 (bundle P5470); https://www.bpa.gov/-/media/Aep/transmission/attachment-k/2025-BPA-Transmission-Plan_Final.pdf",
     "maturity": "final",
     "method": "curated",
     "metric": "line_planned_work_cost_usd",
     "missing_reason": null,
     "note": "The same plan's tables give 2029 (PDF p. 85) and 2030 (PDF p. 103) for this project; the text's 2032 is quoted and none is corrected. The GERP summaries state 400,000,000 USD for a scope named differently; the two are never added or reconciled.",
     "period": {
      "as_of": "2026-08-25",
      "kind": "instant"
     },
     "precision": 0,
     "quality": "valid",
     "source_ref": "bpa-line-evidence",
     "unit": "USD",
     "value": 150000000.0
    },
    "holder": null,
    "locator": "PDF p. 88; project lists PDF pp. 85 and 103 (bundle P5470)",
    "missing_reason": null,
    "note": "The same plan's tables give 2029 (PDF p. 85) and 2030 (PDF p. 103) for this project; the text's 2032 is quoted and none is corrected. The GERP summaries state 400,000,000 USD for a scope named differently; the two are never added or reconciled.",
    "source_publisher": "Bonneville Power Administration, Transmission Planning",
    "source_ref": "bpa-line-evidence",
    "source_url": "https://www.bpa.gov/-/media/Aep/transmission/attachment-k/2025-BPA-Transmission-Plan_Final.pdf",
    "statement": "Schultz-Raver Reconductor and Paul Capacitor: \"Both Schultz-Raver #3 and #4 500 kV lines will be re-conductored\"; the #4 series capacitor upgraded to match #3's; a +350/-300 Mvar STATCOM at Olympia 230 kV; a 302 Mvar shunt capacitor bank at Paul 500 kV. \"Expected Energization: 2032\".",
    "topic": "planned_work",
    "unit": "USD",
    "value": 150000000.0
   }
  ],
  "route": {
   "layer_reloaded_at": "2026-09-26T16:01:28Z",
   "length_basis": "Planar length of the published geometry in CONUS Albers (EPSG:5070), within about 1% in the region; BPA publishes no length",
   "length_km": 124.993,
   "metadata_publication_date": "2026-07-07",
   "note": "The geometry as retrieved from BPA's layer on this date. BPA reloads the layer weekly and can change a line's geometry at any reload; the reload stamp dates the layer, not this line.",
   "retrieved_at": "2026-09-29T04:56:57Z"
  },
  "rule": "A line beside a plant or project never establishes a connection, available capacity or transmission service.",
  "statements": 8,
  "upgrades": [
   {
    "as_of": "2026-07-29",
    "bundle_id": "P05470",
    "bundle_name": "SCHULTZ-RAVER SERIES CAPS",
    "cycle": "GERP 1.0",
    "description": "BPA proposes upgrading the existing Schultz-Raver #3 and Schultz-Raver #4 500-kV lines to a higher rated capacity. BPA would reconductor the 77 miles of line (154 miles total) between BPA’s Schultz Substation (Ellensburg, WA) and Raver Substation (Ravensdale, WA).",
    "expected_energization": 2032,
    "fact": {
     "basis": "The estimate a BPA document or layer states for planned work that includes this line, for the scope it names (often other lines and substations too); never this line's cost alone. Nominal dollars; figures from different documents are kept apart, never added or reconciled",
     "coverage": null,
     "denominator": null,
     "evidence": "reported",
     "fact_id": "line:bpa:SHUL-RAVE-3/gerp/P05470#line_planned_work_cost_usd",
     "label": "Cost stated for planned work",
     "locator": "Bundle_ID=P05470; OBJECTID=7; XRefCd=SHUL-RAVE-3; field=Estimated_Costs",
     "maturity": "final",
     "method": "direct",
     "metric": "line_planned_work_cost_usd",
     "missing_reason": null,
     "note": "The layer does not say what the figure covers: the project's other segments and substations, or a group of projects, may share it",
     "period": {
      "as_of": "2026-07-29",
      "kind": "instant",
      "note": "As BPA published it for the GERP cycle"
     },
     "precision": 0,
     "quality": "valid",
     "source_ref": "bpa-gerp-lines",
     "unit": "USD",
     "value": 400000000.0
    },
    "group_name": "Cross Cascades North",
    "id": "project:gerp:P05470",
    "name": "Schultz-Raver 500 kV Line Upgrade",
    "note": "BPA's Grid Expansion and Reinforcement Portfolio layer names this line by its XRefCd; the project follows the existing line and is a plan, not a permit or a route",
    "segment": "Schultz-Raver No 3",
    "source_ref": "bpa-gerp-lines",
    "status": "SCOPING",
    "status_label": "Scoping",
    "type": "project"
   }
  ],
  "voltage": {
   "kv": 500.0,
   "kv_basis": "The layer declares no unit; VoltageMeas is read as kV on the layer-wide reconciliation (validation lines.voltage_unit_is_kv)",
   "raw": 500.0,
   "raw_unit": null,
   "stated": [
    {
     "as_of": "2026-08-25",
     "assertion_id": "shul-rave-3-voltage-tp2025",
     "basis": "The voltage as BPA writes it in its plan; the line layer's VoltageMeas field reads 500 and declares no unit",
     "curation": {
      "checked": "2026-09-27",
      "review_after": "2027-08-25",
      "review_due": false,
      "reviewer": "claude-w51"
     },
     "document": "2025 Transmission Plan (final), section 9.4 West of Cascades North Path",
     "fact": {
      "basis": "The voltage as BPA writes it in its plan; the line layer's VoltageMeas field reads 500 and declares no unit",
      "coverage": null,
      "denominator": null,
      "evidence": "reported",
      "fact_id": "line:bpa:SHUL-RAVE-3/evidence/shul-rave-3-voltage-tp2025#line_voltage_stated_kv",
      "label": "Voltage as BPA writes it",
      "locator": "shul-rave-3-voltage-tp2025; 2025 Transmission Plan (final), section 9.4 West of Cascades North Path; PDF p. 88; https://www.bpa.gov/-/media/Aep/transmission/attachment-k/2025-BPA-Transmission-Plan_Final.pdf",
      "maturity": "final",
      "method": "curated",
      "metric": "line_voltage_stated_kv",
      "missing_reason": null,
      "note": "as_of is the PDF's creation date; the plan prints no issue date. BPA's ATC Implementation Document (V88, PDF p. 8) also writes 500-kV.",
      "period": {
       "as_of": "2026-08-25",
       "kind": "instant"
      },
      "precision": 0,
      "quality": "valid",
      "source_ref": "bpa-line-evidence",
      "unit": "kV",
      "value": 500.0
     },
     "holder": null,
     "locator": "PDF p. 88",
     "missing_reason": null,
     "note": "as_of is the PDF's creation date; the plan prints no issue date. BPA's ATC Implementation Document (V88, PDF p. 8) also writes 500-kV.",
     "source_publisher": "Bonneville Power Administration, Transmission Planning",
     "source_ref": "bpa-line-evidence",
     "source_url": "https://www.bpa.gov/-/media/Aep/transmission/attachment-k/2025-BPA-Transmission-Plan_Final.pdf",
     "statement": "The 2025 Transmission Plan lists the West of Cascades North path's lines as including \"Schultz-Raver #1, #3, and #4 500 kV lines (BPA)\".",
     "topic": "voltage",
     "unit": "kV",
     "value": 500.0
    }
   ]
  }
 },
 "facts": [
  {
   "basis": "BPA field VoltageMeas read as kilovolts: the source declares no unit, but every line whose name states a kV figure carries that figure in the field and values fall on standard classes (validation check lines.voltage_unit_is_kv)",
   "coverage": null,
   "denominator": null,
   "evidence": "reported",
   "fact_id": "line:bpa:SHUL-RAVE-3#voltage_kv",
   "label": "Operating voltage",
   "locator": "BPA Transmission Lines (Public View), layer 0 BPA_TransmissionLines; OBJECTID=821202; GlobalID=9e27a406-9a32-44b9-9362-dd0acc84994d; XRefCd=SHUL-RAVE-3; field=VoltageMeas",
   "maturity": "final",
   "method": "derived",
   "metric": "voltage_kv",
   "missing_reason": null,
   "note": "Unit established by reconciliation: line names that state a kV figure agree with the field for every such line, and values fall on standard transmission classes; the Pacific DC Intertie rows read 1000-1100 (pole-to-pole DC)",
   "period": {
    "as_of": "2026-07-07",
    "kind": "instant"
   },
   "precision": 1,
   "quality": "valid",
   "source_ref": "bpa-lines",
   "unit": "kV",
   "value": 500.0
  },
  {
   "basis": "BPA field VoltageMeas retained as published; the source declares no unit, so no kV assertion is made",
   "coverage": null,
   "denominator": null,
   "evidence": "reported",
   "fact_id": "line:bpa:SHUL-RAVE-3#voltage_raw",
   "label": "Operating voltage (raw source value, unit not declared)",
   "locator": "BPA Transmission Lines (Public View), layer 0 BPA_TransmissionLines; OBJECTID=821202; GlobalID=9e27a406-9a32-44b9-9362-dd0acc84994d; XRefCd=SHUL-RAVE-3; field=VoltageMeas",
   "maturity": "final",
   "method": "direct",
   "metric": "voltage_raw",
   "missing_reason": null,
   "note": null,
   "period": {
    "as_of": "2026-07-07",
    "kind": "instant"
   },
   "precision": 0,
   "quality": "valid",
   "source_ref": "bpa-lines",
   "unit": null,
   "value": 500.0
  }
 ],
 "geometry_vintage": {
  "layer_reloaded_at": "2026-09-26T16:01:28Z",
  "metadata_publication_date": "2026-07-07",
  "note": "Geometry as retrieved; the reload stamp dates BPA's weekly reload of the whole layer, not an edit to this line. Independent of the tabular comparison year",
  "retrieved_at": "2026-09-29T04:56:57Z"
 },
 "id": "line:bpa:SHUL-RAVE-3",
 "name": "Schultz-Raver No 3",
 "nearby_note": "Plants whose reported point lies within 3 km of this line; context, not a connection",
 "nearby_plants": [
  {
   "distance_km": 0.4,
   "id": "plant:eia:56858",
   "name": "Sagebrush Power Partners",
   "type": "plant"
  },
  {
   "distance_km": 0.67,
   "id": "plant:eia:58441",
   "name": "Swauk Wind LLC",
   "type": "plant"
  }
 ],
 "note": "Informational geometry, name and operating voltage (kV, reconciled). No connectivity, capacity, ownership beyond what BPA states, or flow is asserted.",
 "owner": {
  "id": "org:eia:1738",
  "name": "Bonneville Power Administration",
  "note": "Owner as BPA states it: Available Transfer Capability Implementation Document, Version 88 (effective 2026-02-11), PDF p. 8, flow-based path table, Cross Cascades North",
  "relation": "stated",
  "type": "org"
 },
 "paths": [
  {
   "id": "path:bpa:west-of-cascades-north",
   "name": "West of Cascades North",
   "type": "path"
  }
 ],
 "properties": {
  "creation_date": "2026-09-26T16:01:28Z",
  "edit_date": "2026-09-26T16:01:28Z",
  "key_basis": "xref_code",
  "object_id": 821202,
  "operating_line_name": "Schultz-Raver No 3",
  "voltage_class": "500",
  "voltage_kv": 500.0,
  "voltage_raw": {
   "note": "Source declares no unit for VoltageMeas; published as kV on the reconciliation recorded in validation.json (lines.voltage_unit_is_kv)",
   "unit": null,
   "value": 500.0
  },
  "xref_code": "SHUL-RAVE-3"
 },
 "release_id": "20260929T050546Z-51ae0f7d3c78",
 "schema_version": "1.41.0",
 "source_name": null,
 "sources": [
  "bpa-gerp-lines",
  "bpa-line-evidence",
  "bpa-lines",
  "bpa-paths"
 ],
 "type": "line",
 "updated_reason": null
}